My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (6)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:20:46 AM
Creation date
9/30/2015 11:53:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6832
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Erosion and Sediment Control Inspector's Manual <br /> Design Catena <br /> No formal design is required . The following criteria shall be met: <br /> Drainage ge Area <br /> The maximum allowable drainage area is 5 acres (2 ha) . <br /> Dimensions <br /> The minimum allowable-.h eight measured from the upslope side of the dike is 18 inches (45 <br /> cm) . Top width shall be a minimum of 2 feet (60 cm) with a minimum base width of 4.5 feet <br /> (1 .4m) . (See Plate 4. 15a) <br /> Side Slopes <br /> 3 : 1 or flatter. <br /> Grade <br /> The channel behind the dike shall have a positive grade to a stabilized outlet. If the <br /> channel slope is less than or equal to 2% , . no stabilization is usually required . If the slope <br /> is greater than 2% , the channel shall be stabilized in accordance with STORMWATER <br /> CONVEYANCE CHANNEL - Section 5 . 35 (ES BMP 1 . 35) , <br /> Outlet <br /> 1 . The diverted runoff, if free --of sediment, must be released through a stabilized <br /> outlet or channel . <br /> 2. Sediment-laden runoff must be diverted and released through a sediment trapping <br /> facility . <br /> Construction Spec fications <br /> 1 . Whenever feasible , the dike should be built before construction begins on the <br /> project. <br /> 2 . The dike should be adequately compacted to prevent failure . <br /> 3 . Temporary, or permanent seeding and mulch shall be applied to the dike within 15 <br /> days of construction . <br /> 4. The dike should be located to minimize damages by construction operations and <br /> traffic. <br /> 4-56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.