Laserfiche WebLink
Chapter 4 , Best Mana ement Practices for Erosion and Sediment Control. <br /> r <br /> Maint_nance <br /> +� The measure shall be inspected after every storm and repairs made to the dike , flow <br /> channel and outlet, as necessary. Approximately once every week, whether a storm has <br /> occurred or not, the measure shalt be inspected and repairs made if needed . Damages <br /> caused by construction traffic or other activity must be repaired before the end of each <br /> working day, <br /> r <br /> w <br /> r <br /> r <br /> " Compacted Soil <br /> 19 Min. ' ;' ' , , ; : ; _: : ' ' ' ' ' ` ' ' ':; ' F--- Flow <br /> MIn, . <br /> r <br /> 40 <br /> • <br /> w <br /> r <br /> Plate 4.16a Temporary Diversion Dike <br /> Source: Virginia DSWC <br /> 4-57 <br />