Laserfiche WebLink
71 <br />so <br />w <br />M <br />IS <br />L <br />IN <br />w <br />n <br />4, Best Management Practices for Erosion and Sediment Control. <br />Maint_ nance <br />The measure shall be inspected after every storm and repairs made to the dike, flow <br />channel and outlet, as necessary. Approximately once every week, whether a storm has <br />occurred or not, the measure shall be inspected and repairs made if needed. Damages <br />caused by construction traffic or other activity must be repaired before the end of each <br />working day, <br />Plate 4.16a Temporary Diversion Dike <br />Source: Virginia DSWC <br />4-57 <br />