My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:19:40 AM
Creation date
9/30/2015 11:54:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (5)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6833
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Erosion and Sediment Control Inspector's Manual <br /> Design Criteria - <br /> Maximum Drainage Area <br /> Unless the structure is, designed as a permanent pond by a qualified professional engineer, <br /> the maximum allowable drainage area . into the basin shall be 150 acres (61 ha) . <br /> Basin Capacity <br /> The design capacity of the basin must be at least - 134 cubic yards or 3600 cubic feet per <br /> acre (252 m3/ha) of drainage area measured from the bottom of the basin to the crest of <br /> the principal spillway (riser pipe) . Sediment should be removed from the basin when the <br /> volume of the basin has been reduced to 55 cubic yards per acre (104 m3/ha) of drainage <br /> area . The elevation of the sediment clean out level. should be calculated and clearly <br /> marked on the riser. In no case shall the sediment clean out level be higher than one foot <br /> (30 cm) below the top of the riser. (See Plate 4 .26a ) . <br /> Basin Shape <br /> To improve sediment trapping efficiency of the basin , the effective flow length must be <br /> twice the effective flow width . This basin shape may be attained by properly selecting the <br /> site of the basin , by excavation , or by the use of baffles . See Appendix 1 . 26A for design <br /> details . <br /> 67 C.Y. AC." DRY STORAGE <br /> DEWATERING <br /> DEVICE <br /> 67 C.Y./ AC. _ . - <br /> " <br /> WET " STORAGE <br /> �arW� <br /> SEDIMENT CLEANOUT POINT <br /> { " E 3 E - STORAGE DUCED <br /> 4 C.Y.f ACRE) <br /> TO <br /> Plate 4.26a Sediment Basin Storage Volumes <br /> Source: Virginia DSWC <br /> 480 <br />
The URL can be used to link to this page
Your browser does not support the video tag.