Laserfiche WebLink
Florida Erosion and Sediment Control Inspector's Manual <br />Width <br />The measure should be constructed completely across the disturbed portion of the <br />right-of-way. <br />Plate 4.17a Temporary Right-of-way Diversions <br />Source: Virginia OSWC <br />