Laserfiche WebLink
t be the whole, or a part as may be indicated elsewhere in the and "substantially completed" as applied to all or art <br /> of the <br /> PP P <br /> Contract Documents . Work refer to Substantial Completion thereof. <br /> ' 35 . Project Manual--The bound documentary 44 . Supplementary Conditions--That part of the <br /> information prepared for bidding and constructing the Contract Documents which amends or supplements <br /> these <br /> Work. A listing of the contents of the Project Manual, General Conditions. <br /> ' which may be bound in one or more volumes, is contained <br /> in the table(s) of contents . 45 . Supplier--A manufacturer, fabricator, suppli- <br /> er, distributor, materiahnan, or vendor having a direct <br /> 36 . Radioactive Material--Source, special nucle- contract with CONTRACTOR or with any Subcontractor to <br /> ar, or byproduct material as defined by the Atomic Energy finnish materials or equipment to be incorporated in <br />the <br /> Act of 1954 (42 USC Section 2011 et seq.) as amended Work by CONTRACTOR or any Subcontractor. <br /> from time to time. <br /> ' 46. Underground Facilities--All underground <br /> 37 . Resident Project Representative--The autho- pipelines, conduits, ducts, cables, wires, manholes, vaults , <br /> rized representative of ENGINEER who may be assigned to tanks, tunnels, or other such facilities or attachments, and <br /> ' the Site or any part thereof. any encasements containing such facilities, including those <br /> that convey electricity, gases, steam, liquid petroleum <br /> 38 . Samples--Physical examples of materials, products, telephone or other communications, cable <br /> equipment, or workmanship that are representative of some television, water, wastewater, storm water, other liquids or <br /> portion of the Work and which establish the standards by chemicals, or traffic or other control systems . <br /> which such portion of the Work will be judged. <br /> 47 . Unit Price Work--Work to be paid for on the <br /> t 39. Shop Drawings--All drawings, diagrams, basis of unit prices . <br /> illustrations, schedules, and other data or information which <br /> are specifically prepared or assembled by or for CON- 48 . Work--The entire completed construction or <br /> TRACTOR and submitted by CONTRACTOR to illustrate the various separately identifiable parts thereof required to <br /> ' some portion of the Work. be provided under the Contract Documents. Work includes <br /> and is the result of performing or providing all labor, <br /> 40 . Site--Lands or areas indicated in the Contract services, and documentation necessary to produce such <br /> ' Documents as being finnished by OWNER upon which the construction, and furnishing, installing, and incorporating <br /> Work is to be performed, including rights-of-way and all materials and equipment into such construction, <br /> all as <br /> easements for access thereto, and such other lands fiunished required by the Contract Documents . <br /> by OWNER which are designated for the use of <br /> ' CONTRACTOR. 49. Work Change Directive--A written statement <br /> to CONTRACTOR issued on or after the Effective Date of <br /> 41 . Specifications--That part of the Contract the Agreement and signed by OWNER and recommended <br /> ' Documents consisting of written technical descriptions of by ENGINEER ordering an addition, deletion, or revision <br /> materials, equipment, systems, standards, and workmanship in the Work, or responding to differing or unforeseen <br /> as applied to the Work and certain administrative details subsurface or physical conditions under which the Work is <br /> applicable thereto . to be performed or to emergencies. A Work Change <br /> ' Directive will not change the Contract Price or the Contract <br /> 42 . Subcontractor--An individual or entity having Times but is evidence that the parties expect that the change <br /> a direct contract with CONTRACTOR or with any other ordered or documented by a Work Change Directive will be <br /> ' Subcontractor for the performance of a part of the Work at incorporated in a subsequently issued Change Order <br /> the Site . following negotiations by the parties as to its effect, if any, <br /> on the Contract Price or Contract Times . <br /> 43 . Substantial Completion--The time at which <br /> ' the Work (or a specified part thereof) has progressed to the 50. Written Amendment--A written statement <br /> point where, in the opinion of ENGINEER, the Work (or a modifying the Contract Documents, signed by OWNER and <br /> specified part thereof) is sufficiently complete, in CONTRACTOR on or after the Effective Date of the <br /> accordance with the Contract Documents, so that the Work Agreement and normally dealing with the nonengineering or <br /> (or a specified part thereof) can be utilized for the purposes nontechnical rather than strictly construction-related aspects <br /> for which it is intended. The terms "substantially complete" of the Contract Documents. <br /> ' 00700 - 8 <br />