t be the whole, or a part as may be indicated elsewhere in the and "substantially completed" as applied to all or art
<br /> of the
<br /> PP P
<br /> Contract Documents . Work refer to Substantial Completion thereof.
<br /> ' 35 . Project Manual--The bound documentary 44 . Supplementary Conditions--That part of the
<br /> information prepared for bidding and constructing the Contract Documents which amends or supplements
<br /> these
<br /> Work. A listing of the contents of the Project Manual, General Conditions.
<br /> ' which may be bound in one or more volumes, is contained
<br /> in the table(s) of contents . 45 . Supplier--A manufacturer, fabricator, suppli-
<br /> er, distributor, materiahnan, or vendor having a direct
<br /> 36 . Radioactive Material--Source, special nucle- contract with CONTRACTOR or with any Subcontractor to
<br /> ar, or byproduct material as defined by the Atomic Energy finnish materials or equipment to be incorporated in
<br />the
<br /> Act of 1954 (42 USC Section 2011 et seq.) as amended Work by CONTRACTOR or any Subcontractor.
<br /> from time to time.
<br /> ' 46. Underground Facilities--All underground
<br /> 37 . Resident Project Representative--The autho- pipelines, conduits, ducts, cables, wires, manholes, vaults ,
<br /> rized representative of ENGINEER who may be assigned to tanks, tunnels, or other such facilities or attachments, and
<br /> ' the Site or any part thereof. any encasements containing such facilities, including those
<br /> that convey electricity, gases, steam, liquid petroleum
<br /> 38 . Samples--Physical examples of materials, products, telephone or other communications, cable
<br /> equipment, or workmanship that are representative of some television, water, wastewater, storm water, other liquids or
<br /> portion of the Work and which establish the standards by chemicals, or traffic or other control systems .
<br /> which such portion of the Work will be judged.
<br /> 47 . Unit Price Work--Work to be paid for on the
<br /> t 39. Shop Drawings--All drawings, diagrams, basis of unit prices .
<br /> illustrations, schedules, and other data or information which
<br /> are specifically prepared or assembled by or for CON- 48 . Work--The entire completed construction or
<br /> TRACTOR and submitted by CONTRACTOR to illustrate the various separately identifiable parts thereof required to
<br /> ' some portion of the Work. be provided under the Contract Documents. Work includes
<br /> and is the result of performing or providing all labor,
<br /> 40 . Site--Lands or areas indicated in the Contract services, and documentation necessary to produce such
<br /> ' Documents as being finnished by OWNER upon which the construction, and furnishing, installing, and incorporating
<br /> Work is to be performed, including rights-of-way and all materials and equipment into such construction,
<br /> all as
<br /> easements for access thereto, and such other lands fiunished required by the Contract Documents .
<br /> by OWNER which are designated for the use of
<br /> ' CONTRACTOR. 49. Work Change Directive--A written statement
<br /> to CONTRACTOR issued on or after the Effective Date of
<br /> 41 . Specifications--That part of the Contract the Agreement and signed by OWNER and recommended
<br /> ' Documents consisting of written technical descriptions of by ENGINEER ordering an addition, deletion, or revision
<br /> materials, equipment, systems, standards, and workmanship in the Work, or responding to differing or unforeseen
<br /> as applied to the Work and certain administrative details subsurface or physical conditions under which the Work is
<br /> applicable thereto . to be performed or to emergencies. A Work Change
<br /> ' Directive will not change the Contract Price or the Contract
<br /> 42 . Subcontractor--An individual or entity having Times but is evidence that the parties expect that the change
<br /> a direct contract with CONTRACTOR or with any other ordered or documented by a Work Change Directive will be
<br /> ' Subcontractor for the performance of a part of the Work at incorporated in a subsequently issued Change Order
<br /> the Site . following negotiations by the parties as to its effect, if any,
<br /> on the Contract Price or Contract Times .
<br /> 43 . Substantial Completion--The time at which
<br /> ' the Work (or a specified part thereof) has progressed to the 50. Written Amendment--A written statement
<br /> point where, in the opinion of ENGINEER, the Work (or a modifying the Contract Documents, signed by OWNER and
<br /> specified part thereof) is sufficiently complete, in CONTRACTOR on or after the Effective Date of the
<br /> accordance with the Contract Documents, so that the Work Agreement and normally dealing with the nonengineering or
<br /> (or a specified part thereof) can be utilized for the purposes nontechnical rather than strictly construction-related aspects
<br /> for which it is intended. The terms "substantially complete" of the Contract Documents.
<br /> ' 00700 - 8
<br />
|