<br /> ' 1 . 02 Terminology
<br /> " "pie � >,i eener-aea •�
<br /> A. Intent of Certain Terms or Adjectives ep
<br /> 2 , The word "4istall, " whan used in cvraxee
<br /> 1 . Whenever in the Contract Documents the lien 3A '+,, senziees, Fnaterzials, eF equipment,
<br /> shy},
<br /> terms "as allowed," "as approved," or terms of like mean to put into use er plaee in fHm! pesition
<br />said.
<br /> effect or import are used, or the adjectives "reasonable,"
<br /> " eemplete and
<br /> suitable," _ s,"acceptable," "proper," "satisfactory," or read • c- intended
<br /> adjectives of like effect or import are used to describe
<br /> ' an action or determination of ENGINEER as to the 3—The verds-�e� €R or-'!pr
<br /> when
<br /> Work, it is intended that such action or determination used in -c m eetien %4th seFviEes, materials
<br />, eF
<br /> will be solely to evaluate, in general, the completed Pqu�p Bel# "h^ n mean to a >, a install
<br /> Work for compliance with the requirements of and rmter-ials, or- equipment eefMlete-and-fe�
<br /> information in the Contract Documents and confor- r ..+
<br /> - . ended
<br /> mance with the design concept of the completed Project
<br /> as a functioning whole as shown or indicated in the Paragraph DA has been deleted in its entirety.
<br /> ' Contract Documents (unless there is a specific statement �x� a „ «eta}} „ « .-F „ or- «
<br /> pro
<br /> indicating otherwise) . The use of any such term or vide" is net usea in eenneeti
<br /> adjective shall not be effective to assign to ENGINEERrr,�tE+ri� k �r , ,�„„y + + le _,.
<br /> any duty or authority to supervise or direct the an obligatien of G01N9 AGTOP�, '!pr- evide" is
<br /> performance of the Work or any duty or authority to
<br /> undertake responsibility contrary to the provisions of
<br /> paragraph 9. 10 or any other provision of the Contract E. Unless stated otherwise in the Contract Docu-
<br /> Documents. ments, words or phrases which have a well-known technical
<br /> or construction industry or trade meaning are used in the
<br /> B . Day Contract Documents in accordance with such recognized
<br /> ' 1 . The word "day" shall constitute a meaning.
<br /> calendar day of 24 hours measured from midnight to
<br /> the next midnight. ARTICLE 2 - PRELIMINARY MATTERS
<br /> ' C. Defective
<br /> 2 . 01 Delivery of Bonds
<br /> 1 . The word "defective," when modifying
<br /> ' the word "Work," refers to Work that is A. When CONTRACTOR delivers the executed
<br /> unsatisfactory, faulty, or deficient in that it does not Agreements to OWNER, CONTRACTOR shall also deliver
<br /> conform to the Contract Documents or does not to OWNER such Bonds as CONTRACTOR may be
<br /> ' meet the requirements of any inspection, reference required to furnish.
<br /> standard, test, or approval referred to in the Contract
<br /> Documents, or has been damaged prior to 2 . 02 Copies of Documents
<br /> ENGINEER' s recommendation of final payment
<br /> ' (unless responsibility for the protection thereof has A. OWNER shall furnish to CONTRACTOR up to
<br /> been assumed by OWNER at Substantia} ten copies of the Contract Documents. Additional copies
<br /> Completion in accordance with paragraph 14.04 or will be finnished upon request at the cost of reproduction.
<br /> 14. 05 ) .
<br /> 2 . 03 Commencement of Contract Times; Notice to
<br /> Paragraphs D. 1 , 2 and 3 have been deleted and replaced Proceed
<br /> ' by new paragraphs. See the Supplementary Conditions.
<br /> D . Furnish, Install, Perform, Provide A. The Contract Times will commence to run on the
<br /> thirtieth day after the Effective Date of the Agreement or, if
<br /> 1 . The weFd "€umis " when used in a Notice to Proceed is given, on the day indicated in the
<br /> ' Notice to Proceed. A Notice to Proceed may be given at
<br /> shall raean to supply and deliver- d any time within 30 days after the Effective Date of
<br /> the
<br /> materials, equipment + +' Site � +' Agreement. In no event will the Contract Times commence
<br /> z r �
<br /> ' to run later than the sixtieth day after the day of Bid opening
<br /> 00700 - 9