Laserfiche WebLink
' or the thirtieth day after the Effective Date of the Paragraph 2 .05.0 has been deleted and replaced with <br />a <br /> Agreement, whichever date is earlier. p <br /> new paragraph. See the Supplementary Conditions. <br /> ' 2 . 04 Starting the Work Site is staFted, GONT-R A GTO a 03, ,,,M shall , <br /> deliver- to the <br /> A. CONTRACTOR shall start to perform the Work ide ficeat e'' . , di rtifi r <br /> �� rr , <br /> ' on the date when the Contract Times commence to run. No insum a Sana other- e • aeaee r •nsuranee L • , , <br /> Work shall be done at the Site prior to the date on which the them er- any additional insufed may reasonably r-equeso <br /> Contract Times commence to run. <br /> ' <br /> required t ,-pwehase- and maintain in aeeerdanee3A4th <br /> 2 . 05 Before Starting Construction AFtiele 5 . <br /> A. CONTRACTOR 's Review of Contract Documents: Paragraph 2.06.A has been deleted and replaced with a <br /> Before undertaking each part of the Work, new paragraph. See the Supplementary Conditions. <br /> CONTRACTOR shall carefully study and compare the 2 . 06 Pre-construction Conference <br /> Contract Documents and check and verify pertinent figures <br /> therein and all applicable field measurements. �3diia20 aaTo aacz the G oxtiQact T <br /> mCs -5{ai{ to <br /> CONTRACTOR shall promptly report in writing to FUR, but befer-e any bee -- Work at the Site is . ft a r <br /> nee <br /> ENGINEER any conflict, error, ambiguity, or discrepancy ���� <br /> �, and others as <br /> which CONTRACTOR may discover and shall obtain a appropriate 3A411 be held te establish a myoFking <br /> written interpretation or clarification from ENGINEER under-standing <br /> rP -among-the-parties as to the �x ',-oxo <br /> before proceeding with any Work affected thereby; dise-uss the soba , r-efeFFed . in paragraph 2 . 05 .B-, <br /> however, CONTRACTOR shall not be liable to OWNER pFeeedums €er haFAing—Shop DF&v Ings—and e43 <br /> or ENGINEER for failure to report any conflict, error, subffittals, pFeeessing—Applicatiens for- Pa5swnt, aad <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known <br /> thereof. 2 . 07 Initial Acceptance of Schedules <br /> B . Preliminary Schedules: Within ten days after the A. Unless otherwise provided in the Contract Docu- <br /> Effective Date of the Agreement (unless otherwise specified ments, at least ten days before submission of the <br /> first <br /> in the General Requirements), CONTRACTOR shall Application for Payment a conference attended by CON- <br /> submit to ENGINEER for its timely review: TRACTOR, ENGINEER, and others as appropriate will be <br /> held to review for acceptability to ENGINEER as provided <br /> 1 . a preliminary progress schedule indicat- below the schedules submitted in accordance with <br /> ' ing the times (numbers of days or dates) for starting paragraph 2 .05 .13 . CONTRACTOR shall have an <br /> and completing the various stages of the Work, additional ten days to make corrections and adjustments and <br /> including any Milestones specified in the Contract to complete and resubmit the schedules. No progress <br /> ' Documents; payment shall be made to CONTRACTOR until acceptable <br /> schedules are submitted to ENGINEER. <br /> 2 . a preliminary schedule of Shop Drawing <br /> and Sample submittals which will list each required 1 . The progress schedule will be acceptable <br /> submittal and the times for submitting, reviewing, to ENGINEER if it provides an orderly progression <br /> and processing such submittal; and of the Work to completion within any specified <br /> Milestones and the Contract Times . Such accep- <br /> t 3 . a preliminary schedule of values for all of tante will not impose on ENGINEER responsibility <br /> the Work which includes quantities and prices of for the progress schedule, for sequencing, schedul- <br /> items which when added together equal the Contract ing, or progress of the Work nor interfere with or <br /> Price and subdivides the Work into component parts relieve CONTRACTOR from CONTRACTOR' s <br /> in sufficient detail to serve as the basis for progress full responsibility therefor. <br /> payments during performance of the Work. Such <br /> prices will include an appropriate amount of 2. CONTRACTOR' s schedule of Shop <br /> ' overhead and profit applicable to each item of Drawing and Sample submittals will be acceptable <br /> Work. to ENGINEER if it provides a workable <br /> arrangement for reviewing and processing the <br /> ' required submittals . <br /> 00700 - 10 <br />