Laserfiche WebLink
1 . written notice thereof will be given to activities among the various contractors will <br /> be <br /> CONTRACTOR prior to starting any such other identified; <br /> work; and <br /> ' 2 , the specific matters to be covered by such <br /> 2 . if OWNER and CONTRACTOR are authority and responsibility will be itemized; and <br /> unable to agree on entitlement to or on the amount <br /> or extent, if any, of any adjustment in the Contract 3 , the extent of such authority and responsi- <br /> Price or Contract Times that should be allowed as a bilities will be provided. <br /> result of such other work, a Claim may be made <br /> therefor as provided in paragraph 10.05 . B . Unless otherwise provided in the Supplementary <br /> Conditions, OWNER shall have sole authority and respon- <br /> B . CONTRACTOR shall afford each other contractor sibility for such coordination. <br /> who is a party to such a direct contract and each utility <br /> ' owner (and OWNER, if OWNER is performing the other <br /> work with OWNER' s employees) proper and safe access to ARTICLE 8 - OWNER ' S RESPONSIBILITIES <br /> the Site and a reasonable opportunity for the introduction <br /> and storage of materials and equipment and the execution of <br /> ' such other work and shall properly coordinate the Work 8 . 01 Communications to Contractor <br /> with theirs. Unless otherwise provided in the Contract <br /> Documents, CONTRACTOR shall do all cutting, fitting, A. Except as otherwise provided in these General <br /> and patching of the Work that may be required to properly Conditions, OWNER shall issue all communications to <br /> connect or otherwise make its several parts come together CONTRACTOR through ENGINEER. <br /> and properly integrate with such other work. CON- <br /> TRACTOR shall not endanger any work of others by 8 . 02 Replacement of ENGINEER <br /> ' cutting, excavating, or otherwise altering their work and will <br /> only cut or alter their work with the written consent of Part of paragraph 8.02.A has been deleted. <br /> ENGINEER and the others whose work will be affected. A. In case of termination of the employment of <br /> The duties and responsibilities of CONTRACTOR under ENGINEER, OWNER shall appoint an engineers <br /> this paragraph are for the benefit of such utility owners and CONTRACTOR makes n reasonable ..,.: eeti.._ whose <br /> other contractors to the extent that there are comparable status under the Contract Documents shall be that <br /> of the <br /> provisions for the benefit of CONTRACTOR in said direct former ENGINEER. <br /> contracts between OWNER and such utility owners and <br /> other contractors . 8 . 03 Furnish Data <br /> C. If the proper execution or results of any part of A. OWNER shall promptly furnish the data required <br /> CONTRACTOR' s Work depends upon work performed by of OWNER under the Contract Documents. <br /> others under this Article 7, CONTRACTOR shall inspect <br /> ' such other work and promptly report to ENGINEER in 8 .04 Pay Promptly When Due <br /> writing any delays, defects, or deficiencies in such other <br /> work that render it unavailable or unsuitable for the proper A. OWNER shall make payments to CONTRACTOR <br /> execution and results of CONTRACTOR' s Work. promptly when they are due as provided in paragraphs <br /> ' CONTRACTOR' s failure to so report will constitute an 14 .02 .0 and 14 .07 .C. <br /> acceptance of such other work as fit and proper for <br /> integration with CONTRACTOR' s Work except for latent 8 .05 Lands and Easements; Reports and Tests <br /> ' defects and deficiencies in such other work. <br /> A. OWNER' s duties in respect of providing lands and <br /> 7 . 02 Coordination easements and providing engineering surveys to establish <br /> reference points are set forth in paragraphs 4 .01 and 4 . 05 . <br /> ' A. If OWNER intends to contract with others for the Paragraph 4. 02 refers to OWNER' s identifying and making <br /> performance of other work on the Project at the Site, the available to CONTRACTOR copies of reports of explora- <br /> following will be set forth in Supplementary Conditions : tions and tests of subsurface conditions and drawings of <br /> ' physical conditions in or relating to existing surface or <br /> 1 . the individual or entity who will have subsurface structures at or contiguous to the Site that have <br /> authority and responsibility for coordination of the been utilized by ENGINEER in preparing the Contract <br /> ' Documents . <br /> 00700 - 28 <br />