My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-030
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:19:57 PM
Creation date
9/30/2015 7:18:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2004
Control Number
2004-030
Agenda Item Number
7.F.
Entity Name
Oklawaha Farms Inc.
Subject
Harmony Oaks Mitigation Project Wetlands restoration
Area
Vero Shores
Project Number
9219A
Bid Number
6045
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3631
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' bilities and the limitations of authority of ENGINEER as <br /> 8 . 06 Insurance OWNER' s representative during construction are set forth <br /> in the Contract Documents and will not be changed without <br /> A. OWNER' s responsibilities, if any, in respect to written consent of OWNER and ENGINEER. <br /> purchasing and maintaining liability and property insurance <br /> are set forth in Article 5 . 9 .02 Visits to Site <br /> ' 8 . 07 Change Orders A. ENGINEER will make visits to the Site at inter- <br /> vals appropriate to the various stages of construction as <br /> A. OWNER is obligated to execute Change Orders as ENGINEER deems necessary in order to observe as an <br /> indicated in paragraph 10.03 , experienced and qualified design professional the progress <br /> that has been made and the quality of the various aspects of <br /> 8 . 08 Inspections, Tests, and Approvals CONTRACTOR' s executed Work. Based on information <br /> ' obtained during such visits and observations, ENGINEER, <br /> A. OWNER's responsibility in respect to certain for the benefit of OWNER, will determine, in general, if the <br /> inspections, tests, and approvals is set forth in paragraph Work is proceeding in accordance with <br /> the Contract <br /> 13 . 03 .B . Documents . ENGINEER will not be required to make <br /> exhaustive or continuous inspections on the Site to check <br /> 8 . 09 Limitations on OWNER 's Responsibilities the quality or quantity of the Work. ENGINEER' s efforts <br /> will be directed toward providing for OWNER a greater <br /> A. The OWNER shall not supervise, direct, or have degree of confidence that the completed Work will conform <br /> control or authority over, nor be responsible for, generally to the Contract Documents . On the basis of such <br /> CONTRACTOR's means, methods, techniques, sequences, visits and observations, ENGINEER will keep OWNER <br /> ' or procedures of construction, or the safety precautions and informed of the progress of the Work and will endeavor to <br /> programs incident thereto, or for any failure of CON- guard OWNER against defective Work. <br /> TRACTOR to comply with Laws and Regulations applica- <br /> ble to the performance of the Work. OWNER will not be B . ENGINEER' s visits and observations are subject <br /> ' responsible for CONTRACTOR' s failure to perform the to all the limitations on ENGINEER's authority and <br /> Work in accordance with the Contract Documents, responsibility set forth in paragraph 9. 10, and particularly, <br /> but without limitation, during or as a result of ENGINEER's <br /> 8 . 10 Undisclosed Hazardous Environmental visits or observations of CONTRACTOWs Work <br /> Condition ENGINEER will not supervise, direct, control, or have <br /> authority over or be responsible for CONTRACTOR ' s <br /> A. OWNER' s responsibility in respect to an undis- means, methods, techniques, sequences, or procedures of <br /> closed Hazardous Environmental Condition is set forth in construction, or the safety precautions and programs <br /> paragraph 4 .06. incident thereto, or for any failure of CONTRACTOR to <br /> comply with Laws and Regulations applicable to the <br /> ' 8 . 11 Evidence of Financial Arrangements performance of the Work. <br /> A. If and to the extent OWNER has agreed to furnish 9 . 03 Project Representative <br /> CONTRACTOR reasonable evidence that financial <br /> ' arrangements have been made to satisfy OWNER' s A. If OWNER and ENGINEER agree, ENGINEER <br /> obligations under the Contract Documents, OWNER's will furnish a Resident Project Representative to <br />assist <br /> responsibility in respect thereof will be as set forth in the ENGINEER in providing more extensive observation of the <br /> ' Supplementary Conditions . Work. The responsibilities and authority and limitations <br /> thereon of any such Resident Project Representative and <br /> assistants will be as provided in paragraph 9. 10 and in the <br /> ARTICLE 9 - ENGINEER ' S STATUS DURING Supplementary Conditions. If OWNER designates another <br /> ' CONSTRUCTION representative or agent to represent OWNER at the Site <br /> who is not ENGINEER' s Consultant, agent or employee, <br /> the responsibilities and authority and limitations thereon of <br /> 9 . 01 OWNER 'S Representative such other individual or entity will be as provided in the <br /> Supplementary Conditions . <br /> A. ENGINEER will be OWNER's representative <br /> during the construction period. The duties and responsi- <br /> 00700 - 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.