Laserfiche WebLink
1 <br /> SECTION 01009 <br /> ' SPECIAL PROVISIONS <br /> 1 . 1 GENERAL <br /> ' A . Visits to the construction site may be made by representatives of permitting or <br /> governing bodies . Submit details of all instructions from the above to the <br /> ' ENGINEER immediately. The Work will not be accepted by the OWNER until final <br /> acceptance has been received from the various Regulatory Agencies having <br /> jurisdiction . <br /> B . Furnish sufficient labor, construction equipment and materials , and work such <br /> hours , including night shifts and overtime operations , as maybe necessary to insure <br /> the prosecution of the work . <br /> C . All salvageable material and equipment for which specific use , relocation or other <br /> ' disposal is not specifically noted , shall remain the property of the OWNER and shall <br /> be delivered to the OWNER at the following location : the Indian River County Road <br /> and Bridge Facility at 4550 41st Street , Vero Beach , at the CONTRACTOR' s <br /> ' expense . All material and equipment not in salvageable condition , as determined <br /> bythe ENGINEER and the OWNER , shall be disposed of bythe CONTRACTOR , at <br /> ' the CONTRACTOR's expense . <br /> D . Requirements of Permits or Grants : In addition to these Specifications , all work shall <br /> comply with the requirements of local permitting agencies , St . Johns River Water <br /> ' Management District , and all other state or federal agencies ' permit or grant <br /> requirements . If there is a conflict between the Specifications and any permit or <br /> grant requirement , then the most stringent specification or requirement shall govern . <br /> ' In any event , the ENGINEER shall determine which specification or requirement <br /> governs , and the ENGINEER' s decision shall be final . <br /> ' E . Other Specifications and Requirements : In some instances , the Specifications <br /> contained herein may referto other requirements or specifications (such as FDOT' s <br /> Standard Specifications for Road and Bridge Construction ) . If there is a conflict <br /> between the Specifications and any referenced specification or requirement , then <br /> the most stringent specification or requirement shall govern . In any event , the <br /> ENGINEER shall determine which specification or requirement governs , and the <br /> ENGINEER' s decision shall be final . <br /> ' F . Notify all permitting agencies of intention to begin construction . Give proper <br /> notification within the time frame required by the agency . <br /> ' Last revised 3/1 /03 01009- 1 HARMONY OAKS <br /> FAPublic WorksVeithM\Stormwater Projects\Harmony Oaks Mitigation Project\Construction Contract\Technical <br /> Specifications\Division 1 \01009 - Special Provisions .doc <br />