Laserfiche WebLink
Documents . <br /> ' 1 .4 CONTRACTS <br /> A . The Work shall be constructed under one prime contract . <br /> 1 . 5 PARTIAL UTILIZATION BY OWNER <br /> A. Conduct the Work to maintain existing facilities in operation at all times . <br /> 1 . 6 CONTRACTOR' s USE OF PREMISES <br /> ' A . Secure a location for on-site storage of all material and equipment necessa for <br /> 9necessary <br /> completion of this project . Submit the proposed location and storage layout to the <br /> iOWNER/ENGINEER at the pre-construction conference for approval . <br /> Be Assume full responsibility for protection and safekeeping of products stored on or off <br /> premises . <br /> Co Move stored products that interfere with the operations of the OWNER . <br /> D r all additional to <br /> Obtain and pay fo a storage or work areas required . <br /> E . Provide and pay for labor, materials and equipment ; tools , construction equipment <br /> and machinery ; water, heat and utilities required for construction ; and other facilities <br /> and services necessary for proper execution and completion of the work. <br /> F . Secure and pay for Government Fees and Licenses . <br /> G . Give required notice to Agencies and to the public. Take particular care to <br /> adequately inform the public of scheduled temporary disruption of water, drainage , <br /> and/or sewer services . <br /> H . Comply with codes , ordinances , rules , regulations , orders and other legal <br /> requirements of public authorities which bear on performance of the Work. <br /> I . Maintain traffic on all roads and streets , in compliance with the Contract Documents . <br /> + + END OF SECTION + + <br /> Last Revised 3/11 /03 01010-2 HARMONY OAKS <br /> RIPublic Worksweithmstormwater Projects\Harmony oaks Mitigation Project\construction contract erechnicai <br /> SpecificationsUivision 1 \01010 - Summary of Work.doc <br />