Laserfiche WebLink
' application for payment . <br /> E . Item 1 . 05 - Payment Bond : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for providing a Payment Bond as required by these Contract Documents . The <br /> total lump sum to be paid for this item shall not exceed one and one -half <br /> ( 1 . 5) percent of the total bid . Twenty-five (25 ) percent of the bid item amount <br /> may be paid in the first application for payment and the remaining seventy-five <br /> ' (75 ) percent of the bid item amount shall be paid in the last application for <br /> payment . <br /> F . Item 1 . 06 - Survey Work: <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation , <br /> including but not limited to , all labor, materials , and equipment required to <br /> testablish and protect survey control points , replace disturbed or destroyed <br /> property monuments and survey control points , and perform construction <br /> staking . Twenty-five (25 ) percent of the bid item amount may be paid in the first <br /> ' application for payment , twenty-five (25 ) percent may be paid at approximately <br /> the one-half way point in the construction contract, and the remaining fifty (50 ) <br /> percent of the bid item amount shall be paid in the last application for payment . <br /> G . Item 1 . 07 - Insurance Coverage Bid Items 1 . 07 <br /> g ( 1 through 1 . 075 , Inclusive ) : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> ' for providing the insurance coverage required by the Contract Documents . <br /> Payment for Insurance Coverage will not be made until the project is complete <br /> and accepted by the OWNER . <br /> EARTHWORK <br /> H . Item 2 . 01 — Prevention , Control , and Abatement of Erosion and Water Pollution <br /> From the Construction Site and the Contractor' s Activities : <br /> 1 . 1 Item 2 . 01A — Design : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for site-specific design of an erosion and stormwater pollution control system (s ) <br /> by a specialty subcontractor in accordance with the Contract Documents and <br /> regulatory requirements , including but not limited to , all labor; materials ; and <br /> equipment. <br /> ' 1 . 2 Item 2 . 01 B — Installation : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for a specialty subcontractor installing an erosion and stormwater pollution <br /> ' control system (s ) in accordance with the Contract Documents and regulatory <br /> requirements , including but not limited to , all labor; materials ; and equipment . <br /> Upon proper installation , the CONTRACTOR may be paid for up to 75 percent <br /> ' Last revised 1 /13/04 01025-4 HARMONY OAKS <br /> F:\Public WorksWeithmstormwater Projects\Harmony Oaks Mitigation Project\Construction Contract\Technical <br /> Specifications0vision 1 \Addendum #1 - 01025 - Measurement and Payment.doc <br />