i <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for mobilization of construction operations , including but not limited to , <br /> ' performance of construction preparatory operations , including all labor and <br /> materials necessary to transport equipment and personnel to the project site , <br /> temporary construction utilities , CONTRACTOR' s field offices , and removing all <br /> ' of the CONTRACTOR ' s equipment, etc , from the project site when the Work is <br /> complete . The total lump sum to be paid for this item shall not exceed five <br /> (5) percent of the total bid . Fifty (50 ) percent of the bid item amount may be <br /> paid in the first application for payment and the remaining fifty (50 ) percent of <br /> the bid item amount shall be paid in the last application for payment as <br /> demobilization . No additional payment will be made for demobilization or <br /> remobilization due to shutdowns , suspensions of work or for other mobilization <br /> activities . <br /> B . Item 1 . 02 - Maintenance of Traffic: <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for implementation of the Traffic Control Plan , including but not limited to , <br /> furnishing all labor, materials , equipment and incidentals required to maintain <br /> traffic , including necessary detour facilities and traffic control signals during <br /> construction , and conformance to requirements of the Contract Documents , the <br /> ' " Manual of Uniform Traffic Control Devices " ( M . U . T . C . D . ) Part IV , and Florida <br /> Department of Transportation Roadway and Traffic Design Standards Index No . <br /> 600 series . Payment will be based on percent of earned contract ( i . e . , 10 <br /> percent of lump sum amount will be paid at 10 percent of earned contract <br /> amount) . <br /> C . Item 1 . 03 - Project Record Documents : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation , <br /> including but not limited to , all labor, materials , and equipment required to <br /> prepare Project Record Documents , including survey work and AutoCad work . <br /> This bid item shall be paid in the final pay request and after the Record <br /> Documents have been approved by the ENGINEER . No partial payments for <br /> Project Record Documents shall be made . No additional paymentwill be made <br /> for revisions to Project Record Documents to make them comply with the <br /> contract requirements . <br /> D . Item 1 . 04 - Performance Bond : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for providing a Performance Bond as required by these Contract Documents . <br /> The total lump sum to be paid for this item shall not exceed one and one = <br /> ' half ( 1 . 5) percent of the total bid . Twenty-five (25 ) percent of the bid item <br /> amount may be paid in the first application for payment and the remaining <br /> seventy-five (75 ) percent of the bid item amount shall be paid in the last <br /> iLast revised 1 /13/04 01025=3 HARMONY OAKS <br /> R\Public Works\KeithM\Stormwater Projects\Harmony Oaks Mitigation Project\Construction ContractUechnical <br /> Specifications0vision 1 \Addendum #1 - 01025 - Measurement and Payment.doc <br />