Laserfiche WebLink
SECTION 01050 <br /> 1 SURVEYING AND FIELD ENGINEERING SERVICES <br /> 1 . 1 GENERAL <br /> ' A . Provide professional engineering , surveying , and landscaping services specified or <br /> required to execute the Work . <br /> B . Develop and make all detail surveys and measurements needed for construction . <br /> 1 C . Keep a transit and leveling instrument on the site at all times and a skilled <br /> instrument man available whenever necessary for layout of the Work . <br /> D . Provide all material required for benchmarks , control points , grade stakes , and <br /> other items . <br /> ' E . Be solely responsible for all locations , dimensions and levels . No data other than <br /> written orders of the ENGINEER shall justify departure from the dimensions and <br /> levels required by the Drawings . <br /> F . Safeguard all points , stakes , rademarks monuments and benchmarks made or <br /> 9 P 9 , <br /> established on the Work , and reestablish same if disturbed . Rectify all Work <br /> ' improperly installed because of not maintaining , not protecting or removing without <br /> authorization , such established points , stakes , marks and monuments . <br /> ' G . When requested by the ENGINEER , provide such facilities and assistance as may <br /> be necessary for the ENGINEER to check line and grade points placed by the <br /> ' CONTRACTOR . Do no excavation or embankment work until all cross-sectioning <br /> necessary for determining pay quantities has been completed and checked by the <br /> ENGINEER . <br /> 1 . 2 CONTRACTOR' S FIELD ENGINEER/SUPERINTENDENT <br /> A . Employ and retain at the Work site , a field engineer and/or superintendent <br /> capable of performing all required engineering and landscaping tasks . <br /> 1 . 3 SURVEY WORK <br /> A . Prior to commencing work , the CONTRACTOR shall satisfy himself as to the <br /> accuracy of all survey and existing site information as indicated in the Contract <br /> Documents . Immediately notify the ENGINEER upon discovery of any errors , <br /> inaccuracies or omissions in the survey data . The commencing of any of the work <br /> Last revised 3/12/03 01050- 1 HARMONY OAKS <br /> F:\Public Works\KeithM\Stormweter Projects\Harmony Oaks Mitigation Project\Construction Contract\Technical Specifications\01050 <br /> - Field Engineering .doc <br />