My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-030
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:19:57 PM
Creation date
9/30/2015 7:18:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2004
Control Number
2004-030
Agenda Item Number
7.F.
Entity Name
Oklawaha Farms Inc.
Subject
Harmony Oaks Mitigation Project Wetlands restoration
Area
Vero Shores
Project Number
9219A
Bid Number
6045
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3631
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 01520 <br /> ' CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> 1 . 1 SCOPE <br /> A . Provide all construction equipment and facilities and temporary p ry c ontrols <br /> required to satisfactorily complete the work represented on the Drawings and <br /> ' described in the Specifications . <br /> 1 . 2 RESPONSIBILITY <br /> ' A . All construction facilities and tempora controls remain the property of the <br /> temporary P p Y <br /> Contractor establishing them and shall be maintained in a safe and useful <br /> condition until removed from the construction site . <br /> B . All false work , scaffolding , ladders , hoistways , braces , pumping plants , <br /> ' shields , trestles , roadways , sheeting , centering forms , barricades , drains , <br /> flumes , and the like , any of which may be needed in construction of any part <br /> of the work and which are not herein described or specified in detail , must be <br /> furnished , maintained and removed by the CONTRACTOR , who is <br /> responsible for the safety and efficiency of such work and for any damage <br /> that may result from their failure or from their improper construction , <br /> ' maintenance or operation . <br /> C . In accepting the Contract, the CONTRACTOR assumes full responsibility for <br /> the sufficiency and safety of all hoists , cranes , temporary structures or work <br /> and for any damage which may result from their failure or their improper <br /> ' construction , maintenance or operation and will indemnify and save harmless <br /> the OWNER and ENGINEER from all claims , suits or actions and damages <br /> or costs of every description arising by reason of failure to comply with the <br /> above provision . <br /> 1 . 3 TEMPORARY UTILITIES AND SERVICES <br /> ' A . TEMPORARY WATER <br /> 1 . Provide a temporary water service as required for all construction <br /> purposes and pay for all water used . <br /> 2 . Furnish potable drinking water in suitable dispensers and with cups <br /> for use of all employees at the job . <br /> ' 3 . Provide all temporary piping , hoses , etc. , required to transport water <br /> to the point of usage by all trades . <br /> 4 . When temporary water service is no longer required , remove all <br /> ' Last revised 3/24/03 01520- 1 HARMONY OAKS <br /> F:\Public Works\KeithM\Stormweter Projects\Harmony Oaks Mitigation Project\Construction Contract\Technical Specifications\Draft <br /> Specifications\Div-1 \01520 - Construction Facilities.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.