My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-284
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2016 1:44:04 PM
Creation date
9/30/2015 8:25:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/09/2004
Control Number
2004-284
Agenda Item Number
None
Entity Name
Timothy Rose Contracting
Subject
Emergency Contract Highland Drive Storm Sewer Replacement
Hurricane Jeanne
Area
IRFWCD B-10 Canal
Archived Roll/Disk#
3224
Supplemental fields
SmeadsoftID
4729
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . 3 . Suspension of work . The County shall have the right to suspend work wholly or in <br /> part for such period or periods as may be deemed necessary due to unsuitable weather or <br /> other conditions which the County considers unfavorable for the work to proceed . No <br /> delay damages or allowance of any kind will be made for such suspension of work ; <br /> Contractor' s sole remedy shall be an extension of time for completion of the Contract . <br /> 2 . 4 . Coordination/Cooperation . The County and its authorized representatives shall <br /> be permitted proper and safe access to the Work at the Project site , and all reasonable <br /> opportunity for the inspection of all Work and materials at the Project . The County <br /> reserves the right to perform activities in the area where Work is being done under this <br /> Contract with its own forces . The County reserves the right to permit other Contractors to <br /> work within the area where Work is being done under this Contract . Contractor shall <br /> afford the County , and other Contractors , proper and safe access to the Work at the <br /> Project site , and all reasonable opportunity for the introduction and storage of their <br /> �.. equipment , materials and the execution of their work concurrently . Contractor shall not <br /> endanger any work of others by cutting , excavating , or otherwise altering their work and <br /> will only cut or alter their work with the written consent of the County' s project manager <br /> and the others whose work will be affected . The County shall have sole authority and <br /> responsibility for such coordination . The County' s project manager is Christofer J . Kafer , <br /> Jr. , P . E . Indian River County Engineer . <br /> 2 . 5 . Differing Site Conditions . The Contractor shall promptly , and before such <br /> conditions are disturbed , notify the County in writing of: ( 1 ) subsurface or latent physical <br /> conditions at the Project site differing materially from those indicated in this Contract ; or (2 ) <br /> unknown physical conditions at the Project site of an unusual nature , differing materially <br /> from those ordinarily encountered and generally recognized as inherent in Work of the <br /> character provided for in this Contract . The County will promptly investigate the <br /> conditions , and if the County finds that such conditions do materially so differ and cause an <br /> increase or decrease in the Contractor's cost of, or the time required for, performance of <br /> any part of the Work under this Contract , an equitable adjustment shall be made and the <br /> Contract modified in writing accordingly . <br /> 2 . 6 . Independent Contractor . Contractor represents that it is fully experienced and <br /> properly qualified to perform the Work under the Contract and that it is properly licensed , <br /> equipped , organized and financed to perform such Work . Contractor shall act as an <br /> independent Contractor and not as the agent of County in performing the Work under this <br /> Contract , maintaining complete control over its employees and all of its suppliers and <br /> subcontractors . The Contractor shall supervise and direct the Work and shall be solely <br /> responsible for the means , methods , techniques , sequences and procedures of <br /> construction subject to compliance with this Contract . <br /> 2 . 7 . Subcontractors . The Contractor shall be fully responsible for all acts and omissions <br /> of its subcontractors and of persons and organizations directly or indirectly employed by <br /> them to the same extent that it is responsible for the acts and omissions of persons directly <br /> employed by Contractor . Nothing in this Contract shall create any contractual relationship <br /> between the County and any subcontractor or other person or organization having a direct <br /> contract with Contractor , nor shall it create any obligation on the part of the County to pay <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.