My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/15/1962
CBCC
>
Meetings
>
1960's
>
1962
>
10/15/1962
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 11:24:42 AM
Creation date
6/10/2015 8:28:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
10/15/1962
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPIJAWTAL BUILDING COKTRWT <br />THIS SUPPL&MMiTAL AGRZALENT made this day of <br />October, 1962, by and between NRTTO CONSTRUCTION, V�C=>0RAVO, <br />hereinafter called the Contractor, and IUDIJW a <br />political subdivision of the State of Florida, hereinafter called <br />the Owner, <br />WITNI"SL'TH, that the building contract between the Con- <br />tractor and the Owner dated October 1, 1962, be and it is herewith <br />and hereby changed an follows: <br />1. The Contractor shall furnish all of the materials and <br />perform all of the work shown on the drawing entitled "Compaction <br />Layout For Vibroflotatiou" and described in specifications con- <br />tained in a letter dated October 11, 1962, from Vibroflotatiort <br />Foundation Company, 415 West Magnolia Street, Uerritt island, <br />Florida, to Nelson A. Faerber, Naples, Florida, one copy of such <br />drawing and one copy of such letter being attached hereto and made <br />a part hereof; shall pay up to $200.00 for ton (10) relative den- <br />sity tests above the water table after completion of the foregoing <br />work; and shall establish a now finish grade and a re -layout of <br />the building to be erected. <br />2. The time forcompletionOf the work called for by said <br />building contract dated October 1, 1962, an changed by this sup- <br />plemental building contract, shall be extended to April 16, 1963. <br />3-. The contract -price of $121,060.00, an set forth in said <br />building contract dated October 1, 1962, shall be Increased by <br />$5,716.70 to $226,776.70. <br />4. zKo"K lug speocitimaly changed hwein, the said build - <br />Ing contract dated October 1,, 19620 shall remain in full force <br />LAW OFFICE JOHN R. COULD VERO BEACH, FLORIDA <br />
The URL can be used to link to this page
Your browser does not support the video tag.