Laserfiche WebLink
Comprehensive Plan Transportation Element <br /> of median openings, and driveway and spacing access. Any amendments to the county land <br /> development regulations need to be consistent with this element of the IRC Comprehensive Plan. <br /> Advanced Right-of-Way Acquisition <br /> Table 4 . 9 . 1 identifies the county's additional estimated advanced right-of-way needs for <br /> roadways through the year 2025.200 . As indicated, almost all roadways included on the county <br /> Thoroughfare Plan will eventually require additional right-of-way acquisition by the county . <br /> Right of way costs to complete the 2:0"_'52030 Roadway Improvements Plan are approximately <br /> $6&_' �128 . 8 million. <br /> Because of the increase of low intensity, non-urban uses outside of the urban service area, the <br /> county needs to enact measures to ensure that this kind of development does not preclude the <br /> eventual extension of the roadway grid system. The extended roadway grid system is needed to <br /> support the future connectivity and continuity of the road network. If the future land use map is <br /> eventually amended or if the urban service area is extended, maintaining adequate access to <br /> development in these areas will be critical in connecting the county system of roads. <br /> The extended roadway grid network is illustrated in Figure 4 . 10 , Extended Roadway Grid <br /> Network. The right-of-way necessary to maintain this grid network should be protected by <br /> requiring appropriate land dedication through the site plan and subdivision approval process. <br /> Other Needs <br /> Supplemental to the roadway capacity improvements identified in the Cost Feasible Plan, and <br /> intersection and right-of-way needs, there are other traffic circulation system needs that must be <br /> addressed. These other needs include bridge improvements and resurfacings . To preserve the <br /> existing roadway system, regular maintenance and repair projects must be undertaken in addition <br /> to capacity producing projects . Table 4. 9 .4 lists transportation improvements identified through <br /> the Capital Improvements Element of the IRC Comprehensive Plan. <br /> Finally, the MPO ' s 202-32030 cost-feasible roadway improvements plan is depicted in Figure <br /> 4 . 8 . Figure 4 .9 illustrates the 30232030 roadway network laneage that will result from the <br /> implementation of all cost-feasible roadway improvements. Figure 4 . 9A depicts the future <br /> roadway level of service. The County' s future grid network is illustrated in Figure 4. 10. Table <br /> 4 . 9 . 3 is the County' s 29232030 Roadway Improvement Plan. iia tal�nsts read <br /> F yesdfor five , to fifteen, and t t her-izafts through <br /> T <br /> Table 4.7. 1 Existing Roadway Characteristics <br /> LinkOn Street From Sheet To Street Length No. or Exist Road Existing Juris- Functional LOS <br /> to g Lanes ROW Type LOS diction Class Standard <br /> 10 SRAIA S . County Line S. VB City L 4.70 2 100 U A SR MA D <br /> 1020 S .R. ALA S. VB City L 17th St 1 .30 2 120 D D SR MA D <br /> Community Development Department Indian River County 79 <br />