My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-167
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 5:01:24 PM
Creation date
9/30/2015 9:43:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/16/2006
Control Number
2006-167
Agenda Item Number
14.A.2.
Entity Name
Donadio & Associates
Subject
Part II Agreement Review-IRC Fire Station No. 4
Project Number
#5018.001.4.1.2
Supplemental fields
SmeadsoftID
5636
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.2 costs of materials, supplies and equipment, including cost of transportation, <br />whether incorporated or consumed; <br />.3 rental costs of machinery and equipment exclusive of hand tools, whether <br />rented from the Design/Builder or others; <br />.4 costs of premiums for all bonds and insurance permit fees, and sales, use or <br />similar taxes; <br />.5 additional costs of supervision and field office personnel directly attributable <br />to the change; and fees paid to the Architect, engineers and other <br />professionals. <br />§ 8.3.3 Pending final determination of cost to the Owner, amounts not in dispute may be <br />included in Applications for Payment. The amount of credit to be allowed by the <br />Design/Builder to the Owner for deletion or change which results in a net decrease in <br />the Contract Sum will be actual net cost. When both additions and credits covering <br />related Work or substitutions are involved in a change, the allowance for overhead and <br />profit shall be figured on the basis of the net increase, if any, with respect to that <br />change. <br />§ 8.3.4 When the Owner and the Design/Builder agree upon the adjustments in the <br />Contract Sum and Contract Time, such agreement shall be effective immediately and <br />shall be recorded by preparation and execution of an appropriate Change Order. <br />§ 8.4 MINOR CHANGES IN THE WORK <br />§ 8.4.1 The Design/Builder shall have authority to make minor changes in the <br />Construction Documents and construction consistent with the intent of the Contract <br />Documents when such minor changes do not involve adjustment in the Contract Sum or <br />extension of the Contract Time. The Design/Builder shall promptly inform the Owner, in <br />writing, of minor changes in the Construction Documents and construction. <br />§ 8.5 CONCEALED CONDITIONS <br />§ 8.5.1 If conditions are encountered at the site which are (1) subsurface or otherwise <br />concealed physical conditions which differ materially from those indicated in the <br />Contract Documents, or (2) unknown physical conditions of an unusual nature which <br />differ materially from those ordinarily found to exist and generally recognized as <br />inherent in construction activities of the character provided for in the Contract <br />Documents, then notice by the observing party shall be given to the other party promptly <br />before conditions are disturbed and in no event later than 21 days after first observance <br />of the conditions. The Contract Sum shall be equitably adjusted for such concealed or <br />unknown conditions by Change Order upon claim by either party made within 21 days <br />after the claimant becomes aware of the conditions. <br />§ 8.6 REGULATORY CHANGES <br />§ 8.6.1 The Design/Builder shall be compensated for changes in the construction <br />necessitated by the enactment or revisions of codes, laws or regulations subsequent to <br />the submission of the Design/Builder's Proposal. <br />16 <br />