tml, Document G701TM2001
<br /> Change Order
<br /> PROJECT (Name and address): CHANGE ORDER NUMBER: 010 OWNER:
<br /> Indian River County Jail Expansion DATE: March 20, 2007 ARCHITECT:
<br /> 4055 41st Avenue
<br /> Vero Beach, FL32960 CONTRACTOR:
<br /> TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 04083
<br /> FIELD: ❑
<br /> Peter R. Brown CosnWction, Inc. CONTRACT DATE: June 07, 2005
<br /> 1383058" Street North, Suite I CONTRACT FOR: General Construction OTHER: ❑
<br /> Clearwater, FL 33760
<br /> THE CONTRACT IS CHANGED AS FOLLOWS:
<br /> (Include, where applicable, any undisputed amount attributable to previonsl) executed Construction Change Doectives)
<br /> Add additional work of repaving the existing jail parking lot and the east/west connector
<br /> roadway and repave the exercise yards as follows:
<br /> AMOUNT
<br /> Install one inch overlay of Type S-III asphalt on the existing parking lot and the ingress/egress road from the
<br /> parking lot westerly to 41 " Avenue. Also resurface the two (2) existing exercise yards. Work includes striping,
<br /> layout and new wheel stops. Remove and replace fence posts, gates, razor wire, etc. for access into the recreational
<br /> yards for asphalt work. Remove and replace fence posts, gates, razor wire, etc. for access into the recreational yards
<br /> for asphalt work. (Excludes access into east yard since that is already included in current scope of work.) $82,458.00
<br /> Man lift and replace or rework fencing, wire, post and concrete materials due to damage. $ 6, 100.00
<br /> Labor Burden and Sales Tax $ 2,023.00
<br /> TOTAL $90,581 .00
<br /> Acceptance of this proposed change order will not change the Guaranteed Maximum Price, but the Owner's
<br /> Contingency will be reduced by $90,581 .00.
<br /> The original to Guaranteed Maximum Price was $ 18,301 ,631 .00
<br /> The net change by previously authorized Change Orders $ (493,779.35 )
<br /> The Guaranteed Maximum Price prior to this Change Order was $ 17,807,851 .65
<br /> The Guaranteed Maximum Price will be increased/decreased by this Change Order in the amount of $ 0
<br /> The new Guaranteed Maximum Price including this Change Order will be $ 17,807,851 .65
<br /> The Contract Time will be unchanged by Zero ( 0 ) days.
<br /> The date of Substantial Completion as of the date of this Change Order therefore is May 18, 2007
<br /> NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
<br /> have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
<br /> Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
<br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
<br /> Clemons-Rutherford & Associaies,lnc. Peter R. Brown Construction, Inc. Indian River County Board of County
<br /> Commissioners
<br /> ARCHITECT (Firn ame) CONTRACTOR (Firm name) OWNER (1W n AJr,:n
<br /> 2027 Tho sville Road, �ahassee, FI ] 3830 58'" Street North, S ite t 184 5'" Street Ve 'Beach 32960
<br /> 08 learwater, FL 33760 4v�
<br /> ADD ADDRESS '04ADORES -
<br /> Z�V
<br /> Signature) Sin rr BY (Signaiure)
<br /> William D. Rutherford Eduardo T. Vargas Gary •C�ew�;,y','eP) Ga+r N
<br /> (Type name (7)pedname) (Ii'Pe'A.aanp�� ii is
<br /> DA DATE DATE (-"�—
<br /> AIA Document G701T" - 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This Ale
<br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAa Document, or any
<br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
<br /> was produced by AIA software at 18: 19 :30 on 04/03/2007 under Order No.1000250302 1 which expires an 725/2007, and is not for resale.
<br /> User Notes: (2618778805)
<br />
|