My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-100
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 12:22:06 PM
Creation date
9/30/2015 10:40:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
03/20/2007
Control Number
2007-100
Agenda Item Number
7.H.
Entity Name
Peter R. Brown Construction
Subject
Change Order No.010 Jail Parking Lot, Roadway, Exercise Yard
Area
4055 41st. Ave. Jail
Supplemental fields
SmeadsoftID
6221
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Request 4 <br /> Project N Indian River County Jail mmmPleter r <br /> Project is 6-2089 /����7��!✓''�� <br /> Dale: March 18, 2007 Irl , y 1/, y/ I r I <br /> Change Order Request Description: overlay asphalt parking lot, road and rec yards, PETER R. BROWN CONSTRUCTION, INC <br /> Labor Material Subcontract Equipment <br /> Cost UnilUnil Unit Unit <br /> Coda Description city a Unit Price Labor O s Unit Price Material Cry s I Unit Price Sub CITY s Unit Price Equip Tota <br />ls Comments <br /> Install 1 inch overlay type S-III asphalt on <br /> the existing parking lot, ingress/egress <br /> road from the parking lot to the west out <br /> to 41st avenue and the 2 existing <br /> recreation yartls. Work includes Work performed per attached <br /> stripping, layout, and new wheel stops. 1 LS 79,578 79,578 79,578 Subcontractors proposal <br /> Remove and replace fencing, posts, <br /> gates, razor wire, and etcetera for <br /> access into the recreational yards for <br /> asphalt work. (Excludes access into <br /> east yard since already part of scope of <br /> work. 1 80 MH 36 2,880 2,880 <br /> Fencingf Wlre/Posts, Concrete material to <br /> replace/rework due to expected damage 1 LS 5.000 5,000 5.000 <br /> Man lift 2 each 550 1 , 100 1 , 100 <br /> Subtotals 2,880 5,000 79,578 1 ,100 $ 88,558.00 <br /> Labor Burden 0.58 1 .673 <br /> Work excludes removal or rework of existing asphalt and base. Work is to be for overlay only. Fence aprons "outside" recreation yards not included. New asphalt Sales <br />Tax 0.07 350 <br /> will be approximately 1 Inch from existing fences. Excludes removal or adjustment of fencing, drains, manholes, area drains, or other existing items within scope of Subcontract <br />Bonds 0.02 included <br /> work area, asphalt will be worked as closely to existing elevation directly adjacent to these structures. Work is to be performed simultaneously with current work Subtotal <br /> $ 90,581 ,28 <br /> contracted for the Jail Renovation and new construction. If not Construction Manager has option to include overhead and profit for this work. <br /> General Liability Insurance 0.01 - <br /> Work is to be funded by the Contractor's Contingency. Should additional Contractor Contingency be rquired the Owner will provide appropriate funding. Builders Risk Insurance <br /> - - By Owner <br /> Overhead and Profit 0. 10 - <br /> Performance and Payment Bond 0,01 <br /> TOTAL: $ 90,581 .28 <br /> Change Order Request 003 Asphalt parking Rec Yards.xls 1 of 1 _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.