Change Order Request 4 <br /> Project N Indian River County Jail mmmPleter r <br /> Project is 6-2089 /����7��!✓''�� <br /> Dale: March 18, 2007 Irl , y 1/, y/ I r I <br /> Change Order Request Description: overlay asphalt parking lot, road and rec yards, PETER R. BROWN CONSTRUCTION, INC <br /> Labor Material Subcontract Equipment <br /> Cost UnilUnil Unit Unit <br /> Coda Description city a Unit Price Labor O s Unit Price Material Cry s I Unit Price Sub CITY s Unit Price Equip Tota <br />ls Comments <br /> Install 1 inch overlay type S-III asphalt on <br /> the existing parking lot, ingress/egress <br /> road from the parking lot to the west out <br /> to 41st avenue and the 2 existing <br /> recreation yartls. Work includes Work performed per attached <br /> stripping, layout, and new wheel stops. 1 LS 79,578 79,578 79,578 Subcontractors proposal <br /> Remove and replace fencing, posts, <br /> gates, razor wire, and etcetera for <br /> access into the recreational yards for <br /> asphalt work. (Excludes access into <br /> east yard since already part of scope of <br /> work. 1 80 MH 36 2,880 2,880 <br /> Fencingf Wlre/Posts, Concrete material to <br /> replace/rework due to expected damage 1 LS 5.000 5,000 5.000 <br /> Man lift 2 each 550 1 , 100 1 , 100 <br /> Subtotals 2,880 5,000 79,578 1 ,100 $ 88,558.00 <br /> Labor Burden 0.58 1 .673 <br /> Work excludes removal or rework of existing asphalt and base. Work is to be for overlay only. Fence aprons "outside" recreation yards not included. New asphalt Sales <br />Tax 0.07 350 <br /> will be approximately 1 Inch from existing fences. Excludes removal or adjustment of fencing, drains, manholes, area drains, or other existing items within scope of Subcontract <br />Bonds 0.02 included <br /> work area, asphalt will be worked as closely to existing elevation directly adjacent to these structures. Work is to be performed simultaneously with current work Subtotal <br /> $ 90,581 ,28 <br /> contracted for the Jail Renovation and new construction. If not Construction Manager has option to include overhead and profit for this work. <br /> General Liability Insurance 0.01 - <br /> Work is to be funded by the Contractor's Contingency. Should additional Contractor Contingency be rquired the Owner will provide appropriate funding. Builders Risk Insurance <br /> - - By Owner <br /> Overhead and Profit 0. 10 - <br /> Performance and Payment Bond 0,01 <br /> TOTAL: $ 90,581 .28 <br /> Change Order Request 003 Asphalt parking Rec Yards.xls 1 of 1 _ <br />