My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-291
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 11:58:34 AM
Creation date
9/30/2015 9:58:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
08/22/2006
Control Number
2006-291
Agenda Item Number
11.J.1.
Entity Name
J.W. Cheatham, LLC
Subject
CR 512 Phase III and CR 510 Improvements
Supplemental fields
SmeadsoftID
5782
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Department of Utilities <br /> Labor Cost Estimate Attachment 2 <br /> Project, CR SIO 11TILITY COSFLIC'F RESOLUTIONS <br /> Descri rtion : Utilitv Relocations <br /> 27-Jul-06 LABOR COSTS MATERIALCOSTS <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit To[al Material <br /> Item No. Description Quantity Measure Price Price Price Price <br /> Potable Water Main Adjustment Assembly 16" DIP (include (4) 1 EA <br /> 45 Bend) <br /> N23 <br /> Install 16" HDPE by Open Cut 26.0 LF $ 100.00 $2,600.00 57.94 1 ,506.44 <br /> Install Mechanical Restrained Joint Fittings 1 .06 TON $ 1 ,665 .00 $1 ,764.90 3,500.00 3,710.00 <br /> Install Mechanical Restraint Joint on Existing 16" Main 2.0 EA $550.00 $ 1 , 100.00 55.00 110.00 <br /> Make Connection to Existing Main 2.0 EA $795 .00 $ 1 ,590.00 1 ,500.00 3,000.00 <br /> Test Holes/Potholes 2 EA $200.00 $400.00 <br /> Subtotal Subtotal Labor S60,438 .40 561 , 181 44 <br /> Subtotal Subtotal Labor, Mob., Demob., MOT, Materials, & Permitting 564,064.70 <br /> Force Accnt. IRCDUS Contingency Account for additional MOT Devices as I Allowance 100/1, $6,406.47 <br /> Required by Owner and General Conn'actor <br /> SubTotal .abor Cost $70.471 . 17 Subtotal Material Costs $61 , 181 .44 <br /> TOTAL PROJECT COST $ 131 ,652.61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.