My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-291
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 11:58:34 AM
Creation date
9/30/2015 9:58:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
08/22/2006
Control Number
2006-291
Agenda Item Number
11.J.1.
Entity Name
J.W. Cheatham, LLC
Subject
CR 512 Phase III and CR 510 Improvements
Supplemental fields
SmeadsoftID
5782
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River Coutuv Department of Utilities <br /> COS FESTIN1ATE and CONTRAC'I OR'S BID ITEM LIST Attachment 3 <br /> Pro'ecC CR 512 Phase 111 Roadway Improycments - Revised Jul 21 , 2006 <br /> Descri ,ion: Utilih Relocations <br /> 31 -Jul-06 LABOR COSTS MATERIAL COSTS <br /> Bid Bid Item Estimated Unit of Labor Unil Total Labor Material Unit Total Material <br /> Item No. Description Quantity Measure Price Price Price Price <br /> 77 Mobilization 1 4% 59,379.07 <br /> 78 Demobilization 1 1 % $2,344.77 <br /> 79 Maintenance of Traffic I 1 % $2,344.77 <br /> Bid Item U-3 - Sewer Pipe 8" DIP 134 LF <br /> 32d Install 8" DIP Force Main 134.0 LF $9.50 $1 ,273 .00 21A4 2,832. 76 <br /> 7a Install Mechanical Restraint Joint on F_xisting 8" Main 5.0 EA $333.00 $ 1 ,665.00 46. 10 230.50 <br /> 09 Make Connection to Existing Main 1 .0 EA $795.00 $795.00 175.00 175.00 <br /> 23 Test Hales/Potholes 1 EA $200.00 $200.00 0.00 <br /> Bid Item U-4 - Sewer Pipe 10" DIT' 110 LF <br /> 32d Install 10" DIP Force Main 110.0 LF $ 10.80 $ 1 , 188.00 22.59 2,484.90 <br /> 76 Install Mechanical Restraint Joint on Existing 10'- 12" Main 6.0 EA $500.00 $3,000.00 55.00 330.00 <br /> 09 Make Connection to Existing Main 1 .0 EA $795.00 $795.00 175.00 175.00 <br /> 23 Test Holes/Potholes 1 EA $200.00 $200.00 0.00 <br /> Bid Item U-5 - Sewer Pipe 10" IIDPE (Directional Bore) 11050 LF <br /> 04d Install 10" HDPE Horizontal Directional Drill 1 ,050.0 LF $28 .00 $29,400.00 24.42 25,641 .00 <br /> 06 Install Mechanical Restrained Joint Fittings 0.50 'ION S1 ,665 .00 5832 .50 3 ,500.00 1 ,750-00 <br /> 7b Install Mechanical Restraint Joint on Existing 10'- 12" Main 4.0 EA $500.00 S2,000.00 55 .00 220.00 <br /> 09 Make Connection to Existing Main 2.0 EA $795.00 $ 1 ,590.00 1 ,500.00 3,000.00 <br /> 19e Install 10" NRS Plug Valve & Box 2 FA $635 .00 $ 1 ,27000 1 ,695 .00 3,39000 <br /> 23 Test Holes/Potholes 10 EA $200.00 $2 000.00 0.00 <br /> 49b Install 2" Air Release Valve with ARV Manhole & Structure 2 EA $400.00 $800.00 1 ,950.00 3,900.00 <br /> Bid Item U-6 - Sanitary 10" Plug w/Valve Box and Concrete 1 EA <br /> 19e Install 10" NRS Plug Valve & Box 1 EA $635.00 $635.00 1 ,695.00 1 ,695.00 <br /> Bid Item U-7 - Sanitary 8" Plug w/Valve Box and Concrete Pad I EA <br /> 19d Install 8" NRS Plug Valve & Box 1 EA $480.00 $480.00 855.75 855 .75 <br /> Bid Item U-8 - Sanitary Sewer Air Release Manhole (4' wide) 2 EA <br /> Already Included in Pricing for J-5 10" Directional Bore 2 .0 EA 50.00 $0.00 0.00 0.00 <br /> Bid Item U-9 - Air Relief Valve 2 EA <br /> Already Included in Pricing for J-5 10" Directional Bore 2.0 EA 50.00 S0.00 0.00 0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.