Laserfiche WebLink
Question 3 . How is the Embankment to be measured and paid? <br /> Answer. Embankment is measured in C . Y . based on plan quantities and will be paid as a <br /> compacted in-place fill . <br /> Arcadis Plans : <br /> Question 1 . There is an overbuild item on the plans but no line item. <br /> Answer. This was added as Item No . 3344463A TYPE S ASPHALTIC CONCRETE — TN <br /> See Itemized Bid Schedule , revised 09/22/08 . <br /> Knight and McGuire Plans : <br /> Question 2 . As stated on the plans, there is an option to use asphalt overbuild in lieu of new base and <br /> stabilization. <br /> Answer. Due to the high cost of asphalt, overbuild will only be allowed when the cost of overbuild is less <br /> than the cost of new base and stabilization. The overbuild location is to be determined in the field by the <br /> - ENGINEER. <br /> Addendum No. 1, No. 2, and No. 3 (VOID) are also attached for your use. <br /> 000 <br /> ADDENDUM NO . 4 is submitted by ry <br /> ichael D . Nixon, P.E., Roadway Production Manager <br /> Company Name <br /> Title : <br /> Ye. y ' P <br /> Name : S e • <br /> (Type / Printed) / <br /> Authorized Signature : S • hot k ' r Date : 1?0 <br /> Telephone : C 5 6 t� LA I � � Ll Fax : � 5 � I 3 Li e <br /> Page 3 of 3 <br /> ..w... . .. _ nnn r r. __... � 4L A ....1 Add....d..w 414 dnn <br />