Laserfiche WebLink
Question 3. How is the Embankment to be measured and paid? <br />Answer. Embankment is measured in C.Y. based on plan quantities and will be paid as a <br />compacted in-place fill. <br />Arcadis Plans: <br />Question 1. There is an overbuild item on the plans but no line item. <br />Answer. This was added as Item No. 3344463A TYPE S ASPHALTIC CONCRETE — TN <br />See Itemized Bid Schedule, revised 09/22/08. <br />Knight and McGuire Plans: <br />Question 2. As stated on the plans, there is an option to use asphalt overbuild in lieu of new base and <br />stabilization. <br />Answer. Due to the high cost of asphalt, overbuild will only be allowed when the cost of overbuild is less <br />than the cost of new base and stabilization. The overbuild location is to be determined in the field by the <br />ENGINEER. <br />Addendum No. 1, No. 2, and No. 3 (VOID) are also attached for your use. <br />ADDENDUM NO.4 is submitted 1 <br />Company Name <br />Name: <br />Se YeI <br />D. Nixon, P.E., Roadway Production Manager <br />Aov", LLr <br />Pot • J t a Title:y' P <br />(Type / Printed) // <br />Authorized Signature: S • hot kms' r Date: %° A/O 1?0 <br />Telephone: C 5 6 LA I Ll I d '' Fax: � 5 1!) L0 I 3 Li e <br />Page 3 of 3 <br />+w... A.._ nnn 7 r. __... _��e4L A....1 A dd....d..». 414 dnn <br />