My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:01:04 AM
Creation date
10/1/2015 12:45:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342A
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803, 0837, 0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7655
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b . locating all Underground Facilities 4 . 05 Reference Points <br /> shown or indicated in the Contract <br /> Documents , A. OWNER shall provide engineering surveys to <br /> establish reference points for construction which in <br /> c. coordination of the Work with the ENGINEER' s judgment are necessary to enable <br /> owners of such Underground Facilities , CONTRACTOR to proceed with the Work. CON - <br /> including OWNER , during construction , and TRACTOR shall be responsible for laying out the <br /> Work, shall protect and preserve the established <br /> d . the safety and protection of all such reference points and property monuments , and shall <br /> Underground Facilities and repairing any make no changes or relocations without the prior <br /> damage thereto resulting from the Work. written approval of OWNER . CONTRACTOR shall <br /> report to ENGINEER whenever any reference point or <br /> B . Not Shown or Indicated property monument is lost or destroyed or requires <br /> relocation because of necessary changes in grades or <br /> 1 . If an Underground Facility is locations , and shall be responsible for the accurate <br /> uncovered or revealed at or contiguous to the replacement or relocation of such reference points or <br /> Site which was not shown or indicated , or not property monuments by professionally qualified <br /> shown or indicated with reasonable accuracy in personnel . <br /> the Contract Documents, CONTRACTOR shall , <br /> promptly after becoming aware thereof and 4 . 06 Hazardous Environmental Condition at Site <br /> before further disturbing conditions affected <br /> thereby or performing any Work in connection A. Reports and Drawings: Reference is made to <br /> therewith (except in an emergency as required the Supplementary Conditions for the identification of <br /> by paragraph 6 . 16 .A) , identify the owner of those reports and drawings relating to a Hazardous <br /> such Underground Facility and give written Environmental Condition identified at the Site, if any , <br /> notice to that owner and to OWNER and ENGI - that have been utilized by the ENGINEER in the <br /> NEER . ENGINEER will promptly review the preparation of the Contract Documents. <br /> Underground Facility and determine the extent, <br /> if any, to which a change is required in the B . Limited Reliance by CONTRACTOR on <br /> Contract Documents to reflect and document Technical Data Authorized: CONTRACTOR may rely <br /> the consequences of the existence or location upon the general accuracy of the "technical data" <br /> of the Underground Facility. During such time , contained in such reports and drawings , but such <br /> CONTRACTOR shall be responsible for the reports and drawings are not Contract Documents . <br /> safety and protection of such Underground Such "technical data" is identified in the <br /> Facility. Supplementary Conditions . Except for such reliance <br /> on such "technical data , " CONTRACTOR may not rely <br /> 2 . If ENGINEER concludes that a upon or make any Claim against OWNER , <br /> change in the Contract Documents is required , ENGINEER or any of ENGINEER' s Consultants with <br /> a Work Change Directive or a Change Order respect to: <br /> will be issued to reflect and document such <br /> consequences . An equitable adjustment shall 1 . the completeness of such reports <br /> be made in the Contract Price or Contract and drawings for CONTRACTOR's purposes , <br /> Times , or both , to the extent that they are including , but not limited to , any aspects of <br /> the <br /> attributable to the existence or location of any means , methods , techniques , sequences and <br /> Underground Facility that was not shown or procedures of construction to be employed by <br /> indicated or not shown or indicated with CONTRACTOR and safety precautions and <br /> reasonable accuracy in the Contract programs incident thereto ; or <br /> Documents and that CONTRACTOR did not <br /> know of and could not reasonably have been 2 . other data , interpretations , opinions <br /> expected to be aware of or to have anticipated . and information contained in such reports or <br /> If OWNER and CONTRACTOR are unable to shown or indicated in such drawings ; or <br /> agree on entitlement to or on the amount or <br /> extent, if any, of any such adjustment in 3 . any CONTRACTOR interpretation of <br /> Contract Price or Contract Times , OWNER or or conclusion drawn from any "technical data" <br /> CONTRACTOR may make a Claim therefor as or any such other data , interpretations , opinions <br /> provided in paragraph 10 . 05 . or information . <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 13 <br /> FAEngineering\Capital Projects\080317th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract Documents\00700 - General <br /> Conditions REV <br /> 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.