Laserfiche WebLink
3 . differs materially from that shown or or becoming bound under a negotiated <br /> indicated in the Contract Documents; or contract; or <br /> 4 . is of an unusual nature , and differs b . the existence of such condition could <br /> materially from conditions ordinarily reasonably have been discovered or <br /> encountered and generally recognized as inher- revealed as a result of any examination , <br /> ent in work of the character provided for in the investigation , exploration , test, or study of <br /> Contract Documents ; the Site and contiguous areas required by <br /> the Bidding Requirements or Contract <br /> then CONTRACTOR shall , promptly after becoming Documents to be conducted by or for CON- <br /> aware thereof and before further disturbing the TRACTOR prior to CONTRACTOR's <br /> subsurface or physical conditions or performing any making such final commitment; or <br /> Work in connection therewith (except in an emergency <br /> as required by paragraph 6 . 16 .A) , notify OWNER and c. CONTRACTOR failed to give the <br /> ENGINEER in writing about such condition . written notice within the time and as re- <br /> CONTRACTOR shall not further disturb such quired by paragraph 4 . 03 .A. <br /> condition or perform any Work in connection therewith <br /> (except as aforesaid ) until receipt of written order to do 3 . If OWNER and CONTRACTOR are <br /> so. unable to agree on entitlement to or on the <br /> amount or extent, if any, of any adjustment in <br /> B . ENGINEER 's Review. After receipt of written the Contract Price or Contract Times, or both , a <br /> notice as required by paragraph 4 . 03 .A, ENGINEER Claim may be made therefor as provided in <br /> will promptly review the pertinent condition , determine paragraph 10 . 05 . However, OWNER , <br /> the necessity of OWNER's obtaining additional ENGINEER, and ENGINEER's Consultants <br /> exploration or tests with respect thereto, and advise shall not be liable to CONTRACTOR for any <br /> OWNER in writing (with a copy to CONTRACTOR) of claims, costs, losses , or damages ( including <br /> ENGINEER's findings and conclusions. but not limited to all fees and charges of <br /> engineers , architects , attorneys , and other <br /> C . Possible Price and Times Adjustments professionals and all court or arbitration or other <br /> dispute resolution costs) sustained by <br /> 1 . The Contract Price or the Contract CONTRACTOR on or in connection with any <br /> Times , or both , will be equitably adjusted to the other project or anticipated project. <br /> extent that the existence of such differing <br /> subsurface or physical condition causes an in- 4 . 04 Underground Facilities <br /> crease or decrease in CONTRACTOR's cost <br /> of, or time required for, performance of the A. Shown or Indicated. The information and data <br /> Work; subject, however, to the following : shown or indicated in the Contract Documents with <br /> respect to existing Underground Facilities at or <br /> a. such condition must meet any one or contiguous to the Site is based on information and <br /> more of the categories described in para- data furnished to OWNER or ENGINEER by the <br /> graph 4 . 03 .A; and owners of such Underground Facilities , including <br /> OWNER , or by others . Unless it is otherwise <br /> b. with respect to Work that is paid for expressly provided in the Supplementary Conditions: <br /> on a Unit Price Basis , any adjustment in <br /> Contract Price will be subject to the 1 . OWNER and ENGINEER shall not <br /> provisions of paragraphs 9 . 08 and 11 . 03 . be responsible for the accuracy or com - <br /> pleteness of any such information or data; and <br /> 2 . CONTRACTOR shall not be entitled <br /> to any adjustment in the Contract Price or 2 . the cost of all of the following will be <br /> Contract Times if: included in the Contract Price, and CONTRAC- <br /> TOR shall have full responsibility for: <br /> a . CONTRACTOR knew of the <br /> existence of such conditions at the time a . reviewing and checking all such <br /> CONTRACTOR made a final commitment information and data , <br /> to OWNER in respect of Contract Price and <br /> Contract Times by the submission of a Bid <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 12 <br /> F \Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract Documents\00700 - <br /> General Conditions REV <br /> 04-07.doc <br />