means, method , technique , sequence , or procedure of satisfactory evidence ( including reports of required
<br /> construction which is shown or indicated in and tests) as to the source , kind , and quality of materials
<br /> expressly required by the Contract Documents . CON - and equipment. All materials and equipment shall be
<br /> TRACTOR shall be responsible to see that the stored , applied , installed , connected , erected ,
<br /> completed Work complies accurately with the Contract protected , used , cleaned , and conditioned in
<br /> Documents . accordance with instructions of the applicable
<br /> Supplier, except as otherwise may be provided in the
<br /> B . At all times during the progress of the Work, Contract Documents .
<br /> CONTRACTOR shall assign a competent resident
<br /> superintendent thereto who shall not be replaced 6 . 04 Progress Schedule
<br /> without written notice to OWNER and ENGINEER
<br /> except under extraordinary circumstances . The A. CONTRACTOR shall adhere to the progress
<br /> superintendent will be CONTRACTOR's schedule established in accordance with paragraph
<br /> representative at the Site and shall have authority to 2 . 07 as it may be adjusted from time to
<br /> time as
<br /> act on behalf of CONTRACTOR. All communications provided below.
<br /> given to or received from the superintendent shall be
<br /> binding on CONTRACTOR . 1 . CONTRACTOR shall submit to
<br /> ENGINEER for acceptance (to the extent indi-
<br /> 6 . 02 Labor; Working Hours cated in paragraph 2 . 07) proposed adjustments
<br /> in the progress schedule that will not result in
<br /> A. CONTRACTOR shall provide competent, changing the Contract Times (or Milestones) .
<br /> suitably qualified personnel to survey, lay out, and Such adjustments will conform generally to the
<br /> construct the Work as required by the Contract Docu- progress schedule then in effect and additional-
<br /> ments . CONTRACTOR shall at all times maintain ly will comply with any provisions of the General
<br /> good discipline and order at the Site . Requirements applicable thereto .
<br /> B . Except as otherwise required for the safety or 2 . Proposed adjustments in the
<br /> protection of persons or the Work or property at the progress schedule that will change the Contract
<br /> Site or adjacent thereto, and except as otherwise Times (or Milestones) shall be submitted
<br /> in
<br /> stated in the Contract Documents, all Work at the Site accordance with the requirements of Article 12 .
<br /> shall be performed during regular working hours , and Such adjustments may only be made by a
<br /> CONTRACTOR will not permit overtime work or the Change Order or Written Amendment in accor-
<br /> performance of Work on Saturday, Sunday, or any dance with Article 12 .
<br /> legal holiday without OWNER' s written consent (which
<br /> will not be unreasonably withheld) given after prior 6 . 05 Substitutes and "Or-Equals"
<br /> written notice to ENGINEER .
<br /> A. Whenever an item of material or equipment is
<br /> specified or described in the Contract Documents by
<br /> 6 . 03 Services, Materials, and Equipment using the name of a proprietary item or the name of a
<br /> particular Supplier, the specification or description is
<br /> A. Unless otherwise specified in the General Re- intended to establish the type , function , appearance,
<br /> quirements, CONTRACTOR shall provide and and quality required . Unless the specification or
<br /> assume full responsibility for all services , materials , description contains or is followed by words reading
<br /> equipment, labor, transportation , construction that no like , equivalent, or " or-equal" item or no
<br /> equipment and machinery, tools, appliances , fuel , substitution is permitted , other items of material or
<br /> power, light, heat, telephone , water, sanitary facilities , equipment or material or equipment of other Suppliers
<br /> temporary facilities , and all other facilities and may be submitted to ENGINEER for review under the
<br /> incidentals necessary for the performance , testing , circumstances described below.
<br /> start-up , and completion of the Work.
<br /> 1 . "Or-Equal" Items: If in ENGINEER' s
<br /> B . All materials and equipment incorporated into sole discretion an item of material or equipment
<br /> the Work shall be as specified or, if not specified , shall proposed by CONTRACTOR is functionally
<br /> be of good quality and new, except as otherwise equal to that named and sufficiently similar
<br /> so
<br /> provided in the Contract Documents. All warranties that no change in related Work will be required ,
<br /> and guarantees specifically called for by the Specifica- it may be considered by ENGINEER as an
<br /> tions shall expressly run to the benefit of OWNER . If " or-equal" item , in which case review and
<br /> required by ENGINEER , CONTRACTOR shall furnish approval of the proposed item may, in
<br /> 00700 - General Conditions REV 04-07
<br /> 00700 - 19