My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:01:04 AM
Creation date
10/1/2015 12:45:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342A
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803, 0837, 0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7655
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER' s sole discretion , be accomplished perform adequately the functions and <br /> without compliance with some or all of the achieve the results called for by the general <br /> requirements for approval of proposed substi- design , be similar in substance to that <br /> tute items . For the purposes of this paragraph specified , and be suited to the same use as <br /> 6 . 05 . A. 1 , a proposed item of material or that specified . The application will state the <br /> equipment will be considered functionally equal extent, if any, to which the use of the pro- <br /> to an item so named if: posed substitute item will prejudice <br /> CONTRACTOR's achievement of Substan- <br /> a. in the exercise of reasonable tial Completion on time, whether or not use <br /> judgment ENGINEER determines that: (i) it of the proposed substitute item in the Work <br /> is at least equal in quality, durability, will require a change in any of the Contract <br /> appearance , strength , and design Documents (or in the provisions of any other <br /> characteristics; (ii) it will reliably perform at direct contract with OWNER for work on the <br /> least equally well the function imposed by Project) to adapt the design to the proposed <br /> the design concept of the completed Project substitute item and whether or not <br /> as a functioning whole , and ; incorporation or use of the proposed substi- <br /> tute item in connection with the Work is sub- <br /> b . CONTRACTOR certifies that: (i) ject to payment of any license fee or royalty . <br /> there is no increase in cost to the OWNER; All variations of the proposed substitute <br /> and ( ii ) it will conform substantially, even item from that specified will be identified in <br /> with deviations , to the detailed requirements the application , and available engineering , <br /> of the item named in the Contract sales , maintenance , repair, and <br /> Documents . replacement services will be indicated . The <br /> application will also contain an itemized esti- <br /> 2 . Substitute Items mate of all costs or credits that will result <br /> directly or indirectly from use of such <br /> a. If in ENGINEER's sole discretion an substitute item , including costs of redesign <br /> item of material or equipment proposed by and claims of other contractors affected by <br /> CONTRACTOR does not qualify as an any resulting change, all of which will be <br /> " or-equal" item under paragraph 6 . 05 .A. 11 it considered by ENGINEER in evaluating the <br /> will be considered a proposed substitute proposed substitute item . ENGINEER may <br /> item . require CONTRACTOR to furnish additional <br /> data about the proposed substitute item . <br /> b. CONTRACTOR shall submit suffi- <br /> cient information as provided below to allow B . Substitute Construction Methods or Proce- <br /> ENGINEER to determine that the item of dures: If a specific means , method , technique , se- <br /> material or equipment proposed is quence, or procedure of construction is shown or <br /> essentially equivalent to that named and an indicated in and expressly required by the Contract <br /> acceptable substitute therefor. Requests for Documents, CONTRACTOR may furnish or utilize a <br /> review of proposed substitute items of substitute means , method , technique , sequence, or <br /> material or equipment will not be accepted procedure of construction approved by ENGINEER . <br /> by ENGINEER from anyone other than CONTRACTOR shall submit sufficient information to <br /> CONTRACTOR . allow ENGINEER, in ENGINEER' s sole discretion , to <br /> determine that the substitute proposed is equivalent to <br /> c. The procedure for review by ENGI - that expressly called for by the Contract Documents. <br /> NEER will be as set forth in paragraph The procedure for review by ENGINEER will be similar <br /> 6 . 05 . A. 2 . d , as supplemented in the General to that provided in subparagraph 6 . 05 .A. 2 . <br /> Requirements and as ENGINEER may <br /> decide is appropriate under the C . Engineer's Evaluation: ENGINEER will be <br /> circumstances . allowed a reasonable time within which to evaluate <br /> each proposal or submittal made pursuant to para- <br /> d . CONTRACTOR shall first make graphs 6 . 05 .A and 6 . 05 . 13 . ENGINEER will be the <br /> written application to ENGINEER for review sole judge of acceptability. No "or-equal" or substitute <br /> of a proposed substitute item of material or will be ordered , installed or utilized until ENGINEER's <br /> equipment that CONTRACTOR seeks to review is complete, which will be evidenced by either a <br /> furnish or use. The application shall certify Change Order for a substitute or an approved Shop <br /> that the proposed substitute item will Drawing for an " or equal . " ENGINEER will advise <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 20 <br /> F:\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract Documents\00700 - General <br /> Conditions REV <br /> 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.