CONTRACTOR , any Subcontractor, Supplier, or any <br /> other individual or entity directly or indirectly employed 6 . 17 Shop Drawings and Samples <br /> by any of them to perform any of the Work, or anyone <br /> for whose acts any of them may be liable , shall be A. CONTRACTOR shall submit Shop Drawings <br /> remedied by CONTRACTOR (except damage or loss to ENGINEER for review and approval in accordance <br /> attributable to the fault of Drawings or Specifications with the acceptable schedule of Shop Drawings and <br /> or to the acts or omissions of OWNER or ENGINEER Sample submittals . All submittals will be identified as <br /> or ENGINEER' s Consultant, or anyone employed by ENGINEER may require and in the number of copies <br /> any of them , or anyone for whose acts any of them specified in the General Requirements . The data <br /> may be liable , and not attributable , directly or shown on the Shop Drawings will be complete with <br /> indirectly, in whole or in part, to the fault or negligence respect to quantities , dimensions , specified perfor- <br /> of CONTRACTOR or any Subcontractor, Supplier, or mance and design criteria , materials , and similar data <br /> other individual or entity directly or indirectly employed to show ENGINEER the services , materials , and <br /> by any of them ) . CONTRACTOR's duties and equipment CONTRACTOR proposes to provide and <br /> responsibilities for safety and for protection of the to enable ENGINEER to review the information for the <br /> Work shall continue until such time as all the Work is limited purposes required by paragraph 6 . 17 . E . <br /> completed and ENGINEER has issued a notice to <br /> OWNER and CONTRACTOR in accordance with B . CONTRACTOR shall also submit Samples to <br /> paragraph 14 . 07 . 6 that the Work is acceptable ENGINEER for review and approval in accordance <br /> (except as otherwise expressly provided in connection with the acceptable schedule of Shop Drawings and <br /> with Substantial Completion ) . Sample submittals . Each Sample will be identified . <br /> clearly as to material , Supplier, pertinent data such as <br /> 6 . 14 Safety Representative catalog numbers , and the use for which intended and <br /> otherwise as ENGINEER may require to enable ENGI - <br /> A. CONTRACTOR shall designate a qualified NEER to review the submittal for the limited purposes <br /> and experienced safety representative at the Site required by paragraph 6 . 17 . E. The numbers of each <br /> whose duties and responsibilities shall be the Sample to be submitted will be as specified in the <br /> prevention of accidents and the maintaining and Specifications . <br /> supervising of safety precautions and programs. <br /> C . Where a Shop Drawing or Sample is required <br /> 6 . 15 Hazard Communication Programs by the Contract Documents or the schedule of Shop <br /> Drawings and Sample submittals acceptable to ENGI - <br /> A. CONTRACTOR shall be responsible for NEER as required by paragraph 2 . 07 , any related <br /> coordinating any exchange of material safety data Work performed prior to ENGINEER' s review and <br /> sheets or other hazard communication information approval of the pertinent submittal will be at the sole <br /> required to be made available to or exchanged be- expense and responsibility of CONTRACTOR . <br /> tween or among employers at the Site in accordance <br /> with Laws or Regulations . D . Submittal Procedures <br /> 6 . 16 Emergencies 1 . Before submitting each Shop <br /> Drawing or Sample, CONTRACTOR shall have <br /> A. In emergencies affecting the safety or protec- determined and verified : <br /> tion of persons or the Work or property at the Site or <br /> adjacent thereto , CONTRACTOR is obligated to act to a . all field measurements , quantities , <br /> prevent threatened damage , injury, or loss . dimensions , specified performance criteria , <br /> CONTRACTOR shall give ENGINEER prompt written installation requirements, materials , catalog <br /> notice if CONTRACTOR believes that any significant numbers , and similar information with <br /> changes in the Work or variations from the Contract respect thereto ; <br /> Documents have been caused thereby or are required <br /> as a result thereof. If ENGINEER determines that a b . all materials with respect to intended <br /> change in the Contract Documents is required be- use, fabrication , shipping , handling , storage , <br /> cause of the action taken by CONTRACTOR in assembly, and installation pertaining to the <br /> response to such an emergency, a Work Change performance of the Work; <br /> Directive or Change Order will be issued . <br /> c. all information relative to means, <br /> methods , techniques, sequences , and <br /> procedures of construction and safety <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 24 <br /> F:\Engineering\Capital Projects\0603 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0603 Contract Documents\00700 - <br />General Conditions REV <br /> 04-07.doc <br />