Laserfiche WebLink
precautions and programs incident thereto; 3 . ENGINEER's review and approval of <br /> and Shop Drawings or Samples shall not relieve <br /> CONTRACTOR from responsibility for any <br /> d . CONTRACTOR shall also have variation from the requirements of the Contract <br /> reviewed and coordinated each Shop Documents unless CONTRACTOR has in <br /> Drawing or Sample with other Shop writing called ENGINEER's attention to each <br /> Drawings and Samples and with the such variation at the time of each submittal as <br /> requirements of the Work and the Contract required by paragraph 6 . 17 . D . 3 and ENGI - <br /> Documents . NEER has given written approval of each such <br /> variation by specific written notation thereof <br /> 2 . Each submittal shall bear a stamp or incorporated in or accompanying the Shop <br /> specific written indication that CONTRACTOR Drawing or Sample approval ; nor will any <br /> has satisfied CONTRACTOR's obligations approval ' by ENGINEER relieve CON - <br /> under the Contract Documents with respect to TRACTOR from responsibility for complying <br /> CONTRACTOR's review and approval of that with the requirements of paragraph 6 . 17 . D . 1 . <br /> submittal . <br /> F . Resubmittal Procedures <br /> 3 . At the time of each submittal , CON- <br /> TRACTOR shall give ENGINEER specific 1 . CONTRACTOR shall make correc- <br /> written notice of such variations, if any, that the tions required by ENGINEER and shall return <br /> Shop Drawing or Sample submitted may have the required number of corrected copies of <br /> from the requirements of the Contract Shop Drawings and submit as required new <br /> Documents, such notice to be in a written com- Samples for review and approval . CON- <br /> munication separate from the submittal ; and , in TRACTOR shall direct specific attention in <br /> addition , shall cause a specific notation to be writing to revisions other than the corrections <br /> made on each Shop Drawing and Sample sub- called for by ENGINEER on previous <br /> mitted to ENGINEER for review and approval of submittals . <br /> each such variation . <br /> 6 . 18 Continuing the Work <br /> E . ENGINEER 's Review <br /> A. CONTRACTOR shall carry on the Work and <br /> 1 . ENGINEER will timely review and adhere to the progress schedule during all disputes or <br /> approve Shop Drawings and Samples in disagreements with OWNER . No Work shall be <br /> accordance with the schedule of Shop delayed or postponed pending resolution of any <br /> Drawings and Sample submittals acceptable to disputes or disagreements, except as permitted by <br /> ENGINEER . ENGINEER's review and paragraph 15 . 04 or as OWNER and CONTRACTOR <br /> approval will be only to determine if the items may otherwise agree in writing . <br /> covered by the submittals will , after installation <br /> or incorporation in the Work, conform to the 6 . 19 CONTRACTOR 's General Warranty and <br /> information given in the Contract Documents Guarantee <br /> and be compatible with the design concept of <br /> the completed Project as a functioning whole as A. CONTRACTOR warrants and guarantees to <br /> indicated by the Contract Documents. OWNER , ENGINEER , and ENGINEER's Consultants <br /> that all Work will be in accordance with the Contract <br /> 2 . ENGINEER's review and approval Documents and will not be defective . <br /> will not extend to means , methods, techniques , CONTRACTOR's warranty and guarantee hereunder <br /> sequences, or procedures of construction excludes defects or damage caused by: <br /> (except where a particular means, method , <br /> technique , sequence, or procedure of con- 1 . abuse , modification , or improper <br /> struction is specifically and expressly called for maintenance or operation by persons other <br /> by the Contract Documents) or to safety than CONTRACTOR , Subcontractors, <br /> precautions or programs incident thereto. The Suppliers , or any other individual or entity for <br /> review and approval of a separate item as such whom CONTRACTOR is responsible; or <br /> will not indicate approval of the assembly in <br /> which the item functions . 2 . normal wear and tear under normal <br /> usage . <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 25 <br /> F:\Engineering\Capital Projects\080317th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract Documents\00700 - General <br /> Conditions REV <br /> 04-07 . doc <br />