My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:01:04 AM
Creation date
10/1/2015 12:45:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342A
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803, 0837, 0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7655
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
precautions and programs incident thereto; 3 . ENGINEER's review and approval of <br /> and Shop Drawings or Samples shall not relieve <br /> CONTRACTOR from responsibility for any <br /> d . CONTRACTOR shall also have variation from the requirements of the Contract <br /> reviewed and coordinated each Shop Documents unless CONTRACTOR has in <br /> Drawing or Sample with other Shop writing called ENGINEER's attention to each <br /> Drawings and Samples and with the such variation at the time of each submittal as <br /> requirements of the Work and the Contract required by paragraph 6 . 17 . D . 3 and ENGI - <br /> Documents . NEER has given written approval of each such <br /> variation by specific written notation thereof <br /> 2 . Each submittal shall bear a stamp or incorporated in or accompanying the Shop <br /> specific written indication that CONTRACTOR Drawing or Sample approval ; nor will any <br /> has satisfied CONTRACTOR's obligations approval ' by ENGINEER relieve CON - <br /> under the Contract Documents with respect to TRACTOR from responsibility for complying <br /> CONTRACTOR's review and approval of that with the requirements of paragraph 6 . 17 . D . 1 . <br /> submittal . <br /> F . Resubmittal Procedures <br /> 3 . At the time of each submittal , CON- <br /> TRACTOR shall give ENGINEER specific 1 . CONTRACTOR shall make correc- <br /> written notice of such variations, if any, that the tions required by ENGINEER and shall return <br /> Shop Drawing or Sample submitted may have the required number of corrected copies of <br /> from the requirements of the Contract Shop Drawings and submit as required new <br /> Documents, such notice to be in a written com- Samples for review and approval . CON- <br /> munication separate from the submittal ; and , in TRACTOR shall direct specific attention in <br /> addition , shall cause a specific notation to be writing to revisions other than the corrections <br /> made on each Shop Drawing and Sample sub- called for by ENGINEER on previous <br /> mitted to ENGINEER for review and approval of submittals . <br /> each such variation . <br /> 6 . 18 Continuing the Work <br /> E . ENGINEER 's Review <br /> A. CONTRACTOR shall carry on the Work and <br /> 1 . ENGINEER will timely review and adhere to the progress schedule during all disputes or <br /> approve Shop Drawings and Samples in disagreements with OWNER . No Work shall be <br /> accordance with the schedule of Shop delayed or postponed pending resolution of any <br /> Drawings and Sample submittals acceptable to disputes or disagreements, except as permitted by <br /> ENGINEER . ENGINEER's review and paragraph 15 . 04 or as OWNER and CONTRACTOR <br /> approval will be only to determine if the items may otherwise agree in writing . <br /> covered by the submittals will , after installation <br /> or incorporation in the Work, conform to the 6 . 19 CONTRACTOR 's General Warranty and <br /> information given in the Contract Documents Guarantee <br /> and be compatible with the design concept of <br /> the completed Project as a functioning whole as A. CONTRACTOR warrants and guarantees to <br /> indicated by the Contract Documents. OWNER , ENGINEER , and ENGINEER's Consultants <br /> that all Work will be in accordance with the Contract <br /> 2 . ENGINEER's review and approval Documents and will not be defective . <br /> will not extend to means , methods, techniques , CONTRACTOR's warranty and guarantee hereunder <br /> sequences, or procedures of construction excludes defects or damage caused by: <br /> (except where a particular means, method , <br /> technique , sequence, or procedure of con- 1 . abuse , modification , or improper <br /> struction is specifically and expressly called for maintenance or operation by persons other <br /> by the Contract Documents) or to safety than CONTRACTOR , Subcontractors, <br /> precautions or programs incident thereto. The Suppliers , or any other individual or entity for <br /> review and approval of a separate item as such whom CONTRACTOR is responsible; or <br /> will not indicate approval of the assembly in <br /> which the item functions . 2 . normal wear and tear under normal <br /> usage . <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 25 <br /> F:\Engineering\Capital Projects\080317th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract Documents\00700 - General <br /> Conditions REV <br /> 04-07 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.