My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:01:04 AM
Creation date
10/1/2015 12:45:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342A
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803, 0837, 0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7655
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
correction period for that item may start to run from an any other provision of the Contract Documents , <br /> earlier date if so provided in the Specifications or by OWNER may, after seven days written notice to <br /> Written Amendment. CONTRACTOR , correct and remedy any such <br /> deficiency. <br /> C . Where defective Work (and damage to other <br /> Work resulting therefrom ) has been corrected or B . In exercising the rights and remedies under <br /> removed and replaced under this paragraph 13 . 07 , this paragraph , OWNER shall proceed expeditiously. <br /> the correction period hereunder with respect to such In connection with such corrective and remedial <br /> Work will be extended for an additional period of one action , OWNER may exclude CONTRACTOR from all <br /> year after such correction or removal and replacement or part of the Site , take possession of all or part of the <br /> has been satisfactorily completed . Work and suspend CONTRACTOR' s services related <br /> thereto, take possession of CONTRACTOR's tools , <br /> D . CONTRACTOR's obligations under this appliances, construction equipment and machinery at <br /> paragraph 13 . 07 are in addition to any other obligation the Site, and incorporate in the Work all materials and <br /> or warranty. The provisions of this paragraph 13 . 07 equipment stored at the Site or for which OWNER has <br /> shall not be construed as a substitute for or a waiver paid CONTRACTOR but which are stored elsewhere . <br /> of the provisions of any applicable statute of limitation CONTRACTOR shall allow OWNER , OWNER' s <br /> or repose . representatives , agents and employees, OWNER' s <br /> other contractors , and ENGINEER and ENGINEER' s <br /> 13 . 08 Acceptance of Defective Work Consultants access to the Site to enable OWNER to <br /> exercise the rights and remedies under this <br /> A. If, instead of requiring correction or removal paragraph . <br /> and replacement of defective Work, OWNER (and , <br /> prior to ENGINEER's recommendation of final pay- C . All Claims , costs , losses , and damages <br /> ment, ENGINEER) prefers to accept it, OWNER may (including but not limited to all fees and charges of <br /> do so . CONTRACTOR shall pay all Claims , costs , engineers , architects , attorneys , and other <br /> losses , and damages (including but not limited to all professionals and all court or arbitration or <br /> other <br /> fees and charges of engineers, architects , attorneys , dispute resolution costs) incurred or sustained by <br /> and other professionals and all court or arbitration or OWNER in exercising the rights and remedies under <br /> other dispute resolution costs) attributable to this paragraph 13 . 09 will be charged against CON - <br /> OWNER's evaluation of and determination to accept TRACTOR , and a Change Order will be issued <br /> such defective Work (such costs to be approved by incorporating the necessary revisions in the Contract <br /> ENGINEER as to reasonableness) and the diminished Documents with respect to the Work; and OWNER <br /> value of the Work to the extent not otherwise paid by shall be entitled to an appropriate decrease <br />in the <br /> CONTRACTOR pursuant to this sentence . If any Contract Price . If the parties are unable to agree as to <br /> such acceptance occurs prior to ENGINEER's recom- the amount of the adjustment, OWNER may make a <br /> mendation of final payment, a Change Order will be Claim therefor as provided in paragraph 10 . 05 . Such <br /> issued incorporating the necessary revisions in the claims, costs , losses and damages will include but not <br /> Contract Documents with respect to the Work, and be limited to all costs of repair, or replacement of work <br /> OWNER shall be entitled to an appropriate decrease of others destroyed or damaged by correction , <br /> in the Contract Price , reflecting the diminished value of removal , or replacement of CONTRACTOR ' s <br /> Work so accepted . If the parties are unable to agree defective Work. <br /> as to the amount thereof, OWNER may make a Claim <br /> therefor as provided in paragraph 10 . 05 . If the D . CONTRACTOR shall not be allowed an <br /> acceptance occurs after such recommendation , an extension of the Contract Times (or Milestones) <br /> appropriate amount will be paid by CONTRACTOR to because of any delay in the performance of the Work <br /> OWNER . attributable to the exercise by OWNER of OWNER's <br /> rights and remedies under this paragraph 13 . 09 . <br /> 13 . 09 OWNER May Correct Defective Work <br /> A. If CONTRACTOR fails within a reasonable <br /> time after written notice from ENGINEER to correct <br /> defective Work or to remove and replace rejected <br /> Work as required by ENGINEER in accordance with <br /> paragraph 13 . 06 .A, or if CONTRACTOR fails to <br /> perform the Work in accordance with the Contract <br /> Documents , or if CONTRACTOR fails to comply with <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 38 <br /> FAEngineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract Documents\00700 - General <br /> Conditions REV <br /> 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.