Laserfiche WebLink
progresses . Control delivery schedules so as to minimize unnecessary long -term <br /> storage at the project site prior to installation . <br /> 1 . 5 PROJECT PHOTOGRAPHS /VIDEOS <br /> A . The CONTRACTOR shall make provisions , at his expense , for photographs and <br /> video tapes of all work areas just prior to construction , and for unusual conditions <br /> during construction . The photographs and videos shall show pertinent physical <br /> features along the line of construction . The purpose of the videos is to determine <br /> any damage to private or public property during construction . <br /> B . Pre-Construction Photographs and Video : <br /> 1 . Contractor shall provide the Owner with photographs and video record and one <br /> copy of the existing conditions prior to construction . These photographs and <br /> videos shall be a standard DVD format and shall be narrated . <br /> 2 . The photographs and video shall include , but not be limited to , the following <br /> items shown in a clear manner: <br /> 1 ) All existing features within the right-of-way . <br /> 2 ) All existing features within the temporary construction easement . <br /> 3 ) All existing features within permanent easements . <br /> 4 ) All existing features adjacent to any construction . <br /> 3 . Detail of the photographs and video shall be such that the following examples <br /> shall be clear and visible : <br /> 1 ) Cracks in walls . <br /> 2 ) Condition of fencing . <br /> 3 ) Condition of planted areas and types of vegetation . <br /> 4 ) Condition of sodded areas . <br /> 5 ) Conditions of sprinkler systems and associated controls and wiring . <br /> 6 ) Condition of signs . <br /> 7 ) Conditions of lighting and associated wiring . <br /> 8 ) Significant detail of any pre-existing damages physical features shall be <br /> shown . The coverage of the photographs and video should include the <br /> limits of effects of the use of vibratory rollers . <br /> 9 ) These photographs and video record shall be presented to the Owner <br /> within 30 days of the Notice to Proceed . A copy shall be kept in the <br /> Contractor' s field office . <br /> 10 ) Payment — No additional payment will be made for this work . <br /> + + END OF SECTION + + <br /> 01215-2 01215 General Quality Control <br /> F:\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 <br /> Contract <br /> Documents\01215 <br /> General Quality.doc <br />