My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:03:24 AM
Creation date
10/1/2015 12:45:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342B
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803,0837,0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7656
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01220 <br /> PROGRESS MEETINGS <br /> 1 . 1 SCOPE <br /> A . Date and Time : <br /> 1 . Regular Meetings : As mutually agreed upon by ENGINEER and <br /> CONTRACTOR . <br /> 2 , Other Meetings : On call . <br /> B . Place : CONTRACTOR ' S office at Project site or other mutually agreed upon <br /> location . <br /> C . ENGINEER shall prepare agenda , preside at meetings , and prepare and <br /> distribute a transcript of proceedings to all parties . <br /> D . CONTRACTOR shall provide data required and be prepared to discuss all items <br /> on agenda . <br /> 1 . 2 MINIMUM ATTENDANCE <br /> A . CONTRACTOR <br /> B . SUBCONTRACTOR : <br /> When needed for the discussion of a particular agenda item , CONTRACTOR <br /> shall require representatives of Subcontractors or suppliers to attend a meeting . <br /> C . CONSTRUCTION COORDINATION MANAGER <br /> D . OWNER' S representative , if required . <br /> E . Utility Representatives <br /> F . Others as appropriate . <br /> G . Representatives present for each party shall be authorized to act on their behalf. <br /> 1 . 3 AGENDA <br /> Agenda will include , but will not necessarily be limited to , the following : <br /> 1 . Transcript of previous meeting . <br /> 2 . Progress since last meeting . <br /> 3 . Planned progress for next period . <br /> 4 . Problems , conflicts and observations . <br /> 5 . Change Orders . <br /> 6 . Status of Shop Drawings . <br /> 7 . Quality standards and control . <br /> 8 . Schedules , including off-site fabrication and delivery schedules . Corrective <br /> measures , if required . <br /> 9 . Coordination between parties . <br /> 10 . Safety concerns . <br /> 11 . Other business . <br /> + + END OF SECTION + + <br /> 01220- 1 01220 Progress Meetings <br /> F:\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 <br /> Contract <br /> Documents\01220 - Progress Meetings. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.