On or before the tenth day after the effective date of the Agreement, submit the <br />initial schedules to the ENGINEER. The ENGINEER will review the schedules <br />and return a review copy to the CONTRACTOR within 21 days after receipt. If <br />required by the ENGINEER, resubmit revised schedules on or before the <br />seventh day after receipt of the review copy. If required by the ENGINEER, <br />submit revised monthly progress schedules with that month's application for <br />payment. <br />1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br />A. After receiving approval by the ENGINEER, distribute copies of the <br />approved initial schedule and all reviewed revisions (updated) to: <br />1. Job site file. <br />2. Subcontractors. <br />3. Other concerned parties. <br />4. OWNER (two copies). <br />5. ENGINEER <br />B. In the cover letter, instruct recipients to report promptly to the <br />CONTRACTOR, in writing, any problems anticipated by the projections <br />shown in the schedules. <br />+ + END OF SECTION + + <br />01310-2 <br />01310 Construction Schedule <br />FAEngineering\Capitaâ–º Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 <br />Contract Documents\01310 - Construction Schedule.doc <br />