My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:07:31 AM
Creation date
10/1/2015 12:45:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342D
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803, 0837, 0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7657
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM NO . 110 - CLEARING AND GRUBBING <br /> The work specified in this item shall conform to Section 110 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction . ( Latest Edition ) <br /> with the following modifications : <br /> A . Prior to any clearing and grubbing , the contractor will stake the right-of-way . <br /> Unimproved areas shall be cleared of trees , logs , stumps , brush , vegetation , rubbish <br /> and other perishable or objectionable matter within limits shown on the plans <br /> excepting for certain trees and shrubs shown on the plans or as directed by the <br /> Engineer which are to remain undisturbed and protected . Stumps and roots between <br /> slope stakes in cuts and in embankments 3 feet or less in depth shall be removed to a <br /> depth of 18 inches below subgrade . No stumps , roots , or perishable matter of any <br /> description shall remain under concrete slabs or footing , including pavement and <br /> sidewalks . <br /> B . No trees shall be removed or relocated until the Engineer or his representative has <br /> marked all trees to be saved , after a review of the project site with the Contractor' s <br /> representative . <br /> C . Where the final pavement or structural work will be close to existing trees , the <br /> Contractor shall exercise care in the vicinity of the trees . Further , the Contractor shall <br /> saw cut along the edge of the outside limits of the stabilization , structure subgrade or <br /> sidewalk to a minimum depth of 4 feet below the finish grade and paint with a <br /> commercial grade pruning paint the ends of all sawn roots . If directed by the Engineer <br /> or where shown on the drawings , work shall be done Aby hand@ in order to protect <br /> the trees . <br /> D . The Contractor shall exercise care when working in the vicinity of all trees to remain so <br /> as to not damage or remove major root structures . The Contractor shall not pull hair <br /> or major root structures . All severed roots shall be sawn clean and paint with pruning <br /> paint . Stumps , roots , etc . , shall be completely removed and disposed of by the <br /> Contractor . Undesirable , dead , and /or damaged trees ( as so designated by the <br /> Engineer) shall be removed . <br /> E . All trees to be removed shall be disposed off site ; burning will be strictly prohibited . <br /> F . All trees or shrubs which are to remain shall be preserved and protected by the <br /> Contractor. Where the removal of valuable trees or shrubs specifically for <br /> transplanting is required , this work shall be done in cooperation with the Owner and at <br /> no additional expense to the Owner. <br /> G . All items to be removed shall be excavated to their full depth . All culverts removed <br /> from residential driveway entrances within the right-of-way shall become the property <br /> of the respective homeowner. Those homeowners not desiring the culverts may <br /> donate them to the County free of charge . ( See Paragraph C , Special Provisions ) <br /> 01025- 12 Technical Specifications <br /> F:\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 <br /> Contract Documents\Technical Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.