My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-188
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 10:10:06 AM
Creation date
9/30/2015 11:34:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/07/2009
Control Number
2009-188
Agenda Item Number
8.G.
Entity Name
J.W. Cheatham, LLC
Subject
Contract Roadway Improvements
Area
16th St.-74th Ave. to 66th Ave. 66th Ave. -16th St. to SR 60
Project Number
9920, 9810-A,0545
Bid Number
2009037
Supplemental fields
SmeadsoftID
6814
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
576
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66" Avenue — Carter plans : <br /> • The drainage trunk line was raised. <br /> • Revisions to the 16" water main will be modified to match what was actually installed with the <br /> recently constructed bridge at 66th Avenue and 161h Street. <br /> • Temporary Construction Easements were corrected at various locations on the plans. <br /> • The materials excavated for the 66th Avenue Lake shall be stockpiled on and remain the property <br /> of property owner (Kings Highway LLC). The stock pile shall be 8 feet high, with seed and mulch <br /> and configured as shown on the attached sheet labeled 66`h <br /> 60 . Avenue Lake Site 16`h Street to S.R. <br /> • W1 -7 sign is shown on the plans, Sheet 28 . <br /> • The 60" RCP at Station 90+ 15 and headwalls will be deleted from the scope of work. <br /> • The CRT end anchorage assembly was revised to the ET 2000 . <br /> • Line Item 783 -2-31 ITS FIBER OPTIC CONNECTION (SPLICE) on the Itemized Bid Schedule <br /> Quantity 2 is hereby revised to read Quantity 12. See Revised Itemized Bid Schedule attached. <br /> Sheet 46 Bid Form line item 783 -2-31 on the drawings Quantity 2 is hereby revised to read <br /> Quantity 12 . <br /> • Miscellaneous changes . <br /> • Sheets revised were : Cover, Sheets 2, 53 7, 103 11 , 125 16 through 23 , 29 , 30, and 35 through 40. <br /> • A complete revised set of plans will be provided . <br /> 66`h Avenue — Arcadis plans : <br /> • The drainage trunk line was raised. <br /> • Clarification : there will be no signal included in the project at SR 60. <br /> • Miscellaneous changes . <br /> • Sheets revised were : Cover, 2, 12, 13 , 22, 11A(added) <br /> • A complete revised set of plans will be provided. <br /> Attachments : <br /> Itemized Bid Schedule, Revised March 30, 2009 <br /> New Plans : 16th Street Improvements between 74h Avenue and 66th Avenue Water Main construction and <br /> Force Main Relocation, by IRC Utilities Department, 7 sheets, dated December 2008 . <br /> New Plan : 66th Avenue Lake Site 16`h Street to SR 60, By IRC Engineering Division, 1 sheet, Project <br /> Number 9810, dated 3 /26/09 . <br /> Revised plans : <br /> 16th Street Improvements from 74th Avenue to 66th Avenue, by IRC Engineering Division, Project <br /> Number 9920, marked BID SET ADDENDUM #2 . <br /> 66TH Avenue Roadway Improvements — Phase 1 ( 16th Street to South of State Road 60), by Carter <br /> Associates, Inc . , IRC Project Number 9810A, dated March 18, 2009, marked BID SET <br /> ADDENDUM 92. <br /> 66th Avenue South of State Road 60 to North of State Road 60, By Arcadis U. S ., Inc. , Project <br /> Number A1053 , marked BID SET ADDENDUM #2 - <br /> Pre-bid Meeting Minutes March 18, 2009 . <br /> Page 3 of 4 <br /> F.•IEngineenngl Capital Projectsl9920-16th St, 74th Ave to 66th Ave19920 Contract Documents & SpecslAddendum k2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.