Laserfiche WebLink
C . TRAFFIC CONTROL - STANDARDS : The FDOT Design Standards For Design , <br /> Construction Maintenance and Utility Operations On The State Highway System , <br /> Edition as dated on the plans set forth the basic principles and prescribes minimum <br /> standards to be followed in the design , application , installation , maintenance and <br /> removal of all traffic control devices and all warning devices and barriers which are <br /> necessary to protect the public and workmen from hazards within the project limits . <br /> The standards established in the aforementioned manual constitute the minimum <br /> requirements for normal conditions , and additional traffic control devices warning <br /> devices , barriers or other safety devices will be required where unusual , complex or <br /> particularly hazardous conditions exist . <br /> The above referenced standards were developed using F . H .W .A . , U . S . D . O . T . Manual <br /> on Uniform Traffic Control Devices ( MUTCD) . <br /> D . TRAFFIC CONTROL DEVICES WARNING DEVICES AND BARRIERS <br /> INSTALLATION : The responsibility for installation and maintenance of adequate traffic <br /> control devices , warning devices and barriers , for the protection of the travel in public <br /> and workmen , as well as to safeguard the work area in general shall rest with the <br /> Contractor . Consideration shall be given to recommendations of the Engineer. The <br /> required traffic control devices , warning devices and barriers shall be erected by the <br /> Contractor prior to creation of any hazardous condition and in conjunction with any <br /> necessary re- routing of traffic . The Contractor shall immediately remove , turn or cover <br /> any devices or barriers which do not apply to existing conditions . All traffic control <br /> devices shall conform to MUTCD standards and shall be clean and relatively <br /> undamaged . Damaged devices diminishing legibility and recognition , during either <br /> night or day conditions , are not acceptable for use . <br /> E . NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a <br /> manner that no undue hazard will result due to the requirements of this article , and the <br /> procedures and policies described therein shall in no way act as a waiver of any of the <br /> terms of the liability of the Contractor or his surety . <br /> F . Non-Compliance : Should the Owner or Engineer determine that traffic within the <br /> project is not being maintained in accordance with the approved traffic control plan or <br /> presents a public safety concern , the contractor shall have until the end of the working <br /> day , in which notification is given , to take action to modify the maintenance of traffic . <br /> Should the contractor fail to make such modification the Owner shall have the option to <br /> fine the Contractor $400 per day until remedied . <br /> G . Contractor' s Maintenance of Traffic Plan shall maintain continues vehicular traffic on <br /> Powerline Road at all times . The Contractor shall maintain one lane of traffic at all <br /> times during Powerline Road cross drain culvert constructions . Owner shall have <br /> option to fine the Contractor $ 1 , 000 . 00 per day for Maintenance of Traffic Plan non - <br /> compliance . <br /> 01025-3 Technical Specifications <br /> FAEngineeringZapital Projects\0217-Powerline Road\Bid Documents\Technical specifications .doc <br />