Laserfiche WebLink
Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 102- 1 - Maintenance of Traffic - Lump Sum <br /> ITEM NO . 104-1 - EROSION AND WATER POLLUTION CONTROL <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area . The pollution <br /> control measures shall prevent turbid or otherwise polluted waters from being <br /> discharged from the construction site or work area , to undeveloped portions of <br /> the site or off-site . <br /> B . The OWNER considers pollution from dewatering water and stormwater runoff <br /> from a construction site or work area to be a very serious offense . The <br /> CONTRACTOR is solely responsible for preventing pollution caused by <br /> dewatering water and stormwater runoff from the construction site or work area . <br /> C . The pollution control measures specified herein represent minimum standards <br /> to be adhered to by the CONTRACTOR throughout the Project' s construction . <br /> The OWNER reserves the right to require the CONTRACTOR to employ <br /> additional pollution control measures , when in the sole opinion of the OWNER , <br /> they are warranted . If site specific conditions require additional erosion and <br /> stormwater pollution control measures during any phase of construction or <br /> operation to prevent erosion or to control sediment or other pollution , beyond <br /> those specified in the Drawings or herein , implement additional best <br /> management practices as necessary , in accordance with . Chapter 4 , " Best <br /> Management Practices for Erosion and Sedimentation Control " of the Florida <br /> Erosion and Sediment Control Inspector' s Manual , included herein in Appendix <br /> « B „ <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply <br /> with this Section . Alternatively , the OWNER may halt the CONTRACTOR' s <br /> operations until the CONTRACTOR is in full compliance with this Section . If the <br /> OWNER halts the CONTRACTOR' s work as a result of its failure to comply with <br /> this Section , the Construction Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter 4 , " Best Management <br /> Practices for Erosion and Sedimentation Control " of the Florida Erosion and <br /> Sediment Control Inspector' s Manual , included herein in Appendix " B . " If there <br /> is a conflict between the referenced Chapter 4 and these Specifications , the <br /> more stringent requirement shall prevail . <br /> 01025-4 Technical Specifications <br /> FAEngineering\Capital Projects\0217-Powerline Road\Bid Documents\Technical Specifications .doc <br />