My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-225A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-225A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 2:16:52 PM
Creation date
10/1/2015 12:25:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2008
Control Number
2008-225A
Agenda Item Number
8.H.
Entity Name
J.W. Cheatham,LLC
Subject
Powerline Road Improvements
Area
Powerline Road
Project Number
0217
Bid Number
2008029
Supplemental fields
SmeadsoftID
7490
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
system plans and specifications . <br /> C . Schedule construction to minimize erosion and stormwater runoff from the <br /> construction site . Implement erosion control measures on disturbed areas as <br /> soon as practicable in portions of the site where construction activities have <br /> temporarily or permanently ceased , but in no case more than 7 days after the <br /> construction activity in that portion of the site has temporarily or permanently <br /> ceased . <br /> D . Inspect each pollution control system at least once per day . Clean and <br /> maintain each pollution control system as required by its manufacturer or the <br /> OWNER , until the system is no longer needed . If a water quality violation <br /> occurs , immediately cease all work contributing to the water quality violation and <br /> correct the problem . <br /> E . Discharge shall not violate State or local water quality standards in the receiving <br /> waters , nor cause injury to the public health or to public or private property , nor <br /> to the Work completed or in progress . The receiving point for water from <br /> construction operations shall be approved by the applicable regulatory agency <br /> and the ENGINEER . <br /> F . Promptly repair all damage at no cost to the OWNER . <br /> 1 . 4 SUBMITTALS <br /> A . Shop Drawings : Submit shop drawings of the proposed pollution control and <br /> treatment systems in accordance with Section 01340 Supplementary <br /> Conditions to the General Conditions . <br /> B . Stormwater Pollution Prevention Plan , <br /> 1 . 5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br /> REQUIRED FOR DESIGN INSTALLATION AND MAINTENANCE <br /> A. Site-specific design of the erosion and stormwater pollution control system , and <br /> installation and maintenance of all erosion and stormwater pollution control <br /> devices , shall be by a State certified erosion control specialty subcontractor <br /> who specializes in the design , installation , and maintenance of such devices . <br /> After installation , this subcontractor shall maintain the erosion and stormwater <br /> pollution control devices until the devices are no longer necessary . (Note : The <br /> CONTRACTOR may install and maintain the erosion and stormwater pollution <br /> control system under the direction of the State certified erosion control specialty <br /> - subcontractor. ) Before- beginning construction $ submit to the ENGINEER for <br /> review , a Stormwater Pollution Prevention Plan , prepared by the State <br /> certified erosion control subcontractor . Construction shall not begin until the <br /> 01025-6 Technical specifications <br /> FAEngineering\Capital Projects\0217-Powerline Road\Bid Documents\Technical Specifications .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.