Laserfiche WebLink
system plans and specifications . <br /> C . Schedule construction to minimize erosion and stormwater runoff from the <br /> construction site . Implement erosion control measures on disturbed areas as <br /> soon as practicable in portions of the site where construction activities have <br /> temporarily or permanently ceased , but in no case more than 7 days after the <br /> construction activity in that portion of the site has temporarily or permanently <br /> ceased . <br /> D . Inspect each pollution control system at least once per day . Clean and <br /> maintain each pollution control system as required by its manufacturer or the <br /> OWNER , until the system is no longer needed . If a water quality violation <br /> occurs , immediately cease all work contributing to the water quality violation and <br /> correct the problem . <br /> E . Discharge shall not violate State or local water quality standards in the receiving <br /> waters , nor cause injury to the public health or to public or private property , nor <br /> to the Work completed or in progress . The receiving point for water from <br /> construction operations shall be approved by the applicable regulatory agency <br /> and the ENGINEER . <br /> F . Promptly repair all damage at no cost to the OWNER . <br /> 1 . 4 SUBMITTALS <br /> A . Shop Drawings : Submit shop drawings of the proposed pollution control and <br /> treatment systems in accordance with Section 01340 Supplementary <br /> Conditions to the General Conditions . <br /> B . Stormwater Pollution Prevention Plan , <br /> 1 . 5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br /> REQUIRED FOR DESIGN INSTALLATION AND MAINTENANCE <br /> A. Site-specific design of the erosion and stormwater pollution control system , and <br /> installation and maintenance of all erosion and stormwater pollution control <br /> devices , shall be by a State certified erosion control specialty subcontractor <br /> who specializes in the design , installation , and maintenance of such devices . <br /> After installation , this subcontractor shall maintain the erosion and stormwater <br /> pollution control devices until the devices are no longer necessary . (Note : The <br /> CONTRACTOR may install and maintain the erosion and stormwater pollution <br /> control system under the direction of the State certified erosion control specialty <br /> - subcontractor. ) Before- beginning construction $ submit to the ENGINEER for <br /> review , a Stormwater Pollution Prevention Plan , prepared by the State <br /> certified erosion control subcontractor . Construction shall not begin until the <br /> 01025-6 Technical specifications <br /> FAEngineering\Capital Projects\0217-Powerline Road\Bid Documents\Technical Specifications .doc <br />