Laserfiche WebLink
5 . Retention Ponds — Perimeter elevations , grade breaks , depths , and <br /> calculate pond area at control elevation and grade breaks above water <br /> surface . <br /> 6 . Roadway : <br /> a . Elevations of PVI at Profile Grade Line ( PGL) . <br /> b . Edge of pavement elevations at curb inlets . <br /> C . Install new roadway alignment control points upon final roadway <br /> completion . Include all intersections and side streets . Latitude , <br /> departure and elevations for all control points . <br /> d . Stations and offsets , all structures . <br /> 7 . Utilities : <br /> Record Drawings for water and sewer utilities shall comply with Drawings <br /> M - 159 M16 , M16 (A) , M16 ( B) of the Indian River County Department of <br /> Utility Services Water and Wastewater Utility Standards dated September <br /> 112004 , <br /> 1 . 3 AS- BUILTS <br /> A. CONTRACTOR shall submit marked up Record Drawings to <br /> COUNTY . COUNTY will input As- Built information on Electronic <br /> Drawing files . <br /> B . COUNTY shall deliver to CONTRACTOR seven (7 ) sets of As- <br /> Builts plotted from electronic files with the marked up Record <br /> Drawings . <br /> C . CONTRACTOR' s surveyor shall review , sign and seal As- Builts . <br /> CONTRACTOR shall return marked up Record Drawings and six <br /> (6 ) sets of signed and sealed As- Builts to COUNTY . <br /> D . AS-Builts record survey shall meet minimum technical standard as <br /> set forth by Chapter 61G17 -6 Minimum Technical Standards F . A . C . <br /> Please follow attached checklist under Appendix C . <br /> E . Payment for Record Drawings , Review of Electronic As- Builts and <br /> signing and sealing As- Builts shall be made under Pay Item No . <br /> 108- 1 — Record Drawings — Lump Sum . <br /> 1 . 4 ACCURACY <br /> The CONTRACTOR will be held responsible for the accuracy of Record <br /> Drawings and Electronic As- Builts and shall bear any costs incurred in <br /> finding utilities as a result of incorrect data furnished by the CONTRACTOR . <br /> 1 . 5 SUBMITTAL <br /> Upon Substantial Completion of the Work , deliver Record Drawings to <br /> ENGINEER . Final payment will not be made until satisfactory record <br /> 01025-13 Technical Specifications <br /> FAEngineering\capital Projects\0217-Powerline Road\Bid Documents\Technical Specifications.doc <br />