Laserfiche WebLink
documents are received by ENGINEER . <br /> Record drawings shall conform to recognized standards of drafting , shall be neat <br /> and legible . County will supply Contractor with AutoCAD 14 drawings on compact <br /> disk or 3 . 5 floppy disks . Contractor will input As- Built information on drawings and <br /> return to County . Contractor' s surveyor will sign and sealed six (6) sets of record <br /> drawings . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item 108- 1 - As- Built Drawings - Lump Sum <br /> + + END OF SECTION + + <br /> ITEM NO . 110 - CLEARING AND GRUBBING <br /> The work specified in this item shall conform to Section 110 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction . (Latest Edition ) <br /> with the following modifications : <br /> A . Prior to any clearing and grubbing , the contractor will stake the right-of-way . <br /> Unimproved areas shall be cleared of trees , logs , stumps , brush , vegetation , <br /> rubbish and other perishable or objectionable matter within limits shown on the <br /> plans excepting for certain trees and shrubs shown on the plans or as directed by <br /> the Engineer which are to remain undisturbed and protected . Stumps and roots <br /> between slope stakes in cuts and in embankments 3 feet or less in depth shall be <br /> removed to a depth of 18 inches below subgrade . No stumps , roots , or perishable <br /> matter of any description shall remain under concrete slabs or footing , including <br /> pavement and sidewalks . <br /> B . No trees shall be removed or relocated until the Engineer or his representative has <br /> marked all trees to be saved , after a review of the project site with the Contractor's <br /> representative . <br /> C . Where the final pavement or structural work will be close to existing trees , the <br /> Contractor shall exercise care in the vicinity of the trees . Further , the Contractor <br /> shall saw cut along the edge of the outside limits of the stabilization , structure <br /> subgrade or sidewalk to a minimum depth of 4 feet below the finish grade and paint <br /> with a commercial grade pruning paint the ends of all sawn roots . If directed by the <br /> 01025-14 Technical Specifications <br /> FAEngineering\Capital Projects\0217-Powerline Road\Bid Documents\Technical Specifications .doc <br />