Laserfiche WebLink
Engineer or where shown on the drawings , work shall be done Aby hand@ in order <br /> to protect the trees . <br /> D . The Contractor shall exercise care when working in the vicinity of all trees to remain <br /> so as to not damage or remove major root structures . The Contractor shall not pull <br /> hair or major root structures . All severed roots shall be sawn clean and paint with <br /> pruning paint . Stumps , roots , etc . , shall be completely removed and disposed of by <br /> the Contractor. Undesirable , dead , and/or damaged trees (as so designated by the <br /> Engineer) shall be removed . <br /> E . All trees to be removed shall be disposed off site ; burning will be strictly prohibited . <br /> F . All trees or shrubs which are to remain shall be preserved and protected by the <br /> Contractor. Where the removal of valuable trees or shrubs specifically for <br /> transplanting is required , this work shall be done in cooperation with the Owner and <br /> at no additional expense to the Owner . <br /> G . All items to be removed shall be excavated to their full depth . All culverts removed <br /> from residential driveway entrances within the right-of-way shall become the <br /> property of the respective homeowner. Those homeowners not desiring the <br /> culverts may donate them to the County free of charge . (See Paragraph C , Special <br /> Provisions) The Contractor shall transport the culverts to the County' s storage <br /> yard . All metal castings for catch basins , manholes , or other structures shall be <br /> carefully removed and stored in the County' s Storage Yard if they are deemed <br /> salvageable by the Engineer . The excavated materials shall be removed from the <br /> job site and disposed in a location designated or approved by the Owner . Where <br /> required , suitable material as approved by the Engineer shall then be backfilled and <br /> compacted to restore the original contour of the ground . The fill material shall be <br /> backfilled and compacted in accordance with Section 120 of these specifications . <br /> H . No additional payment will be made , nor will additional work , or change orders be <br /> authorized for work needed to remove , relocate , protect, or otherwise account for in <br /> the construction of the work depicted in the plans , for any feature , or item that <br /> would be apparent from a careful inspection of the site and review of the plans , <br /> even though such feature or item is not specifically called out in the plans . It is <br /> therefore essential the contractor make such inspection and review . <br /> I . The unit price bid for this item shall include the cost of all labor, tools , and <br /> equipment necessary to excavate , remove , and dispose of those items as directed <br /> by the Engineer and where designated on the Drawings . The cost of restoration <br /> and backfill and compaction for the specific area of removal shall also be included <br /> under this item . <br /> Item of Payment <br /> 01025-15 Technical Specifications <br /> FAEngineenng\Capital Projects\0217-Powerline Road\Bid Documents\Technical Specifications .doc <br />