My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-225A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-225A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 2:16:52 PM
Creation date
10/1/2015 12:25:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2008
Control Number
2008-225A
Agenda Item Number
8.H.
Entity Name
J.W. Cheatham,LLC
Subject
Powerline Road Improvements
Area
Powerline Road
Project Number
0217
Bid Number
2008029
Supplemental fields
SmeadsoftID
7490
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br /> SITE CLEANUP AND RESTORATION <br /> 1 . 1 SCOPE <br /> Furnish all labor, equipment , appliances , and materials required or necessary to <br /> clean up and restore the site after the construction is completed . <br /> 1 . 2 REQUIREMENTS <br /> A . During the progress of the project , keep the work and the adjacent areas <br /> affected thereby in a neat and orderly condition . Remove all rubbish , <br /> surplus materials , and unused construction equipment . Repair all <br /> damage so that the public and property owners will be inconvenienced as <br /> little as possible . <br /> B . Provide onsite containers for the collection of waste materials , debris , and <br /> rubbish and empty such containers in a legal manner when they become <br /> full . <br /> C . Where material or debris has been deposited in watercourses , ditches , <br /> gutters , drains , or catch-basins as a result of the CONTRACTOR' s <br /> operations , such material or debris shall be entirely removed and <br /> satisfactorily disposed of during the progress of the work , and the ditches , <br /> channels , drains , etc . , shall be kept clean and open at all times . <br /> D . Before the completion of the project , unless otherwise especially directed <br /> or permitted in writing : <br /> 1 . Tear down and remove all temporary buildings and structures ; <br /> 2 . Remove all temporary works , tools , and machinery , or other <br /> construction equipment furnished ; <br /> 3 . Remove all rubbish from any grounds occupied ; and <br /> 4 . Leave the roads , all parts of the premises , and adjacent property <br /> affected by construction operations , in a neat and satisfactory <br /> condition . <br /> E . Restore or replace any public or private property damaged by construction <br /> work , equipment , or employees , to a condition at least equal to that <br /> existing immediately prior to the beginning of the operations . To this end , <br /> the CONTRACTOR shall restore all highway , roadside , and landscaping <br /> work within any right-of-way , platted or prescriptive . Acceptable materials , <br /> equipment, and methods shall be used for such restoration . <br /> F . Thoroughly clean all materials and equipment installed and on completion <br /> of the work , deliver the facilities undamaged and in fresh and new- <br /> appearing condition . <br /> 01710 Site Cleanup <br /> 01710- 1 <br /> FAEngineering\Capital Projects\0217-Powerline Road\Bid Documents\01710 - Site Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.