2 . 1 . 7. 5 If the budget for the Cost of the Work is exceeded by the lowest bona fide bid or
<br /> negotiated proposal, the Owner shall:
<br /> . 1 give written approval of an increase in the budget for the Cost of the Work;
<br /> . 2 authorize rebidding or renegotiating of the Project within a reasonable time;
<br /> . 3 terminate in accordance with Subparagraph 1.3. 8.5; or
<br /> . 4 cooperate in revising the Project scope and quality as required to reduce the Cost
<br /> of the Work.
<br /> 2 . 1 . 7 . 6 If the Owner chooses to proceed under Clause 2.1.7.5.4, the Architect, without
<br /> additional compensation, shall modify the documents for which the Architect is responsible
<br /> under this Agreement as necessary to comply with the budget for the Cost of the Work. The
<br /> modification of such documents shall be the limit of the Architect's responsibility under this This document has important legal
<br /> Paragraph 2. 1.7. The Architect shall be entitled to compensation in accordance with this consequences. Consultation
<br /> with an
<br /> Agreement for all services performed whether or not construction is commenced. attorney is encouraged with respect to
<br /> its completion or modification.
<br /> ARTICLE 2 . 2 SUPPORTING SERVICES AUTHENTICATION OF THIS
<br /> 2 . 2 . 1 Unless specifically designated in Paragraph 2. 8.3, the services in this Article 2. 2 shall be ELECTRONICALLY DRAFTED AIA
<br /> provided b the Owner or the Owners consultants and contractors. DOCUMENT MAY BE MADE BY USING
<br /> P Y AIA DOCUMENT D401.
<br /> 2 . 2 . 1 . 1 The Owner shall furnish a program setting forth the Owner's objectives, schedule,
<br /> constraints and criteria, including space requirements and relationships, special equipment,
<br /> systems and site requirements.
<br /> 2 . 2 . 1 . 2 The Omer Architect shall furnish surveys to describe physical characteristics, legal
<br /> limitations and utility locations for the site of the Project, and a written legal description of the
<br /> site. The surveys and legal information shall include, as applicable, grades and lines of streets,
<br /> alleys, pavements and adjoining property and structures; adjacent drainage; rights-of-way,
<br /> restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of
<br /> the site; locations, dimensions and necessary data with respect to existing buildings, other
<br /> improvements and trees; and information concerning available utility services and lines, both
<br /> public and private, above and below grade, including inverts and depths. All the information on
<br /> the survey shall be referenced to a Project benchmark.
<br /> 2 . 2 . 1 . 3 The Owner shall furnish services of geotechnical engineers which may include but
<br /> are not limited to test borings, test pits, determinations of soil bearing values, percolation tests,
<br /> evaluations of hazardous materials, ground corrosion tests and resistivity tests, including
<br /> necessary operations for anticipating subsoil conditions, with reports and appropriate
<br /> recommendations.
<br /> ARTICLE 2 . 3 EVALUATION AND PLANNING SERVICES
<br /> 2 . 3 . 1 The Architect shall provide a written preliminary evaluation of the information
<br /> furnished by the Owner under this Agreement, including the Owner's program and schedule
<br /> requirements and budget for the Cost of the Work, each in terms of the other. The Architect +,
<br /> shall review such information to ascertain that it is consistent with the requirements of the f •, ; '
<br /> Project and shall notify the Owner of any other information or consultant services that may be
<br /> reasonably needed for the Project.
<br /> © 1997 AIA®
<br /> 2 . 3 . 2 The Architect shall provide a preliminary evaluation of the Owner' s site for the Project AIA DOCUMENT 8141 - 1997
<br /> based on the information provided by the Owner of site conditions, and the Owner's program, STANDARD FORM AGREEMENT
<br /> schedule and budget for the Cost of the Work. The American Institute of Architects
<br /> 1735 New York Avenue N .W.
<br /> 2 . 3 . 3 The Architect shall review the Owner' s proposed method of contracting for Washington, D .C .
<br /> 20006-5292
<br /> construction services and shall notify the Owner of anticipated impacts that such method may
<br /> have on the Owner's program, financial and time requirements, and the scope of the Project.
<br /> 1917; 19261 1948, 19511 1953, 1958, 19611 1963, 1966, 1967l 1970, 1974, 1977, 1987, Q 1997 by The Amencan
<br /> Institute of Architects . Reproduction of the material herein or substantial quotation of its provisions
<br /> without written permission of the AIA violates the copyright laws of the United States and will subject the
<br /> violator to legal prosecution . WARNING : Unlicensed photocopying violates U .S . copyright laws and will
<br /> subject the violator to legal prosecution . This document was electronically produced with permission of the
<br /> AIA and can be reproduced in accordance with your license without violation until the date of expiration as
<br /> noted below . expiration as noted below . User Document: cra - jail -97bl41 .aia -- 10/29/2004. AIA License
<br /> Number 1127252, which expires on 12/31/2004.
<br /> 16
<br />
|