Laserfiche WebLink
2 . 1 . 7. 5 If the budget for the Cost of the Work is exceeded by the lowest bona fide bid or <br /> negotiated proposal, the Owner shall: <br /> . 1 give written approval of an increase in the budget for the Cost of the Work; <br /> . 2 authorize rebidding or renegotiating of the Project within a reasonable time; <br /> . 3 terminate in accordance with Subparagraph 1.3. 8.5; or <br /> . 4 cooperate in revising the Project scope and quality as required to reduce the Cost <br /> of the Work. <br /> 2 . 1 . 7 . 6 If the Owner chooses to proceed under Clause 2.1.7.5.4, the Architect, without <br /> additional compensation, shall modify the documents for which the Architect is responsible <br /> under this Agreement as necessary to comply with the budget for the Cost of the Work. The <br /> modification of such documents shall be the limit of the Architect's responsibility under this This document has important legal <br /> Paragraph 2. 1.7. The Architect shall be entitled to compensation in accordance with this consequences. Consultation <br /> with an <br /> Agreement for all services performed whether or not construction is commenced. attorney is encouraged with respect to <br /> its completion or modification. <br /> ARTICLE 2 . 2 SUPPORTING SERVICES AUTHENTICATION OF THIS <br /> 2 . 2 . 1 Unless specifically designated in Paragraph 2. 8.3, the services in this Article 2. 2 shall be ELECTRONICALLY DRAFTED AIA <br /> provided b the Owner or the Owners consultants and contractors. DOCUMENT MAY BE MADE BY USING <br /> P Y AIA DOCUMENT D401. <br /> 2 . 2 . 1 . 1 The Owner shall furnish a program setting forth the Owner's objectives, schedule, <br /> constraints and criteria, including space requirements and relationships, special equipment, <br /> systems and site requirements. <br /> 2 . 2 . 1 . 2 The Omer Architect shall furnish surveys to describe physical characteristics, legal <br /> limitations and utility locations for the site of the Project, and a written legal description of the <br /> site. The surveys and legal information shall include, as applicable, grades and lines of streets, <br /> alleys, pavements and adjoining property and structures; adjacent drainage; rights-of-way, <br /> restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of <br /> the site; locations, dimensions and necessary data with respect to existing buildings, other <br /> improvements and trees; and information concerning available utility services and lines, both <br /> public and private, above and below grade, including inverts and depths. All the information on <br /> the survey shall be referenced to a Project benchmark. <br /> 2 . 2 . 1 . 3 The Owner shall furnish services of geotechnical engineers which may include but <br /> are not limited to test borings, test pits, determinations of soil bearing values, percolation tests, <br /> evaluations of hazardous materials, ground corrosion tests and resistivity tests, including <br /> necessary operations for anticipating subsoil conditions, with reports and appropriate <br /> recommendations. <br /> ARTICLE 2 . 3 EVALUATION AND PLANNING SERVICES <br /> 2 . 3 . 1 The Architect shall provide a written preliminary evaluation of the information <br /> furnished by the Owner under this Agreement, including the Owner's program and schedule <br /> requirements and budget for the Cost of the Work, each in terms of the other. The Architect +, <br /> shall review such information to ascertain that it is consistent with the requirements of the f •, ; ' <br /> Project and shall notify the Owner of any other information or consultant services that may be <br /> reasonably needed for the Project. <br /> © 1997 AIA® <br /> 2 . 3 . 2 The Architect shall provide a preliminary evaluation of the Owner' s site for the Project AIA DOCUMENT 8141 - 1997 <br /> based on the information provided by the Owner of site conditions, and the Owner's program, STANDARD FORM AGREEMENT <br /> schedule and budget for the Cost of the Work. The American Institute of Architects <br /> 1735 New York Avenue N .W. <br /> 2 . 3 . 3 The Architect shall review the Owner' s proposed method of contracting for Washington, D .C . <br /> 20006-5292 <br /> construction services and shall notify the Owner of anticipated impacts that such method may <br /> have on the Owner's program, financial and time requirements, and the scope of the Project. <br /> 1917; 19261 1948, 19511 1953, 1958, 19611 1963, 1966, 1967l 1970, 1974, 1977, 1987, Q 1997 by The Amencan <br /> Institute of Architects . Reproduction of the material herein or substantial quotation of its provisions <br /> without written permission of the AIA violates the copyright laws of the United States and will subject the <br /> violator to legal prosecution . WARNING : Unlicensed photocopying violates U .S . copyright laws and will <br /> subject the violator to legal prosecution . This document was electronically produced with permission of the <br /> AIA and can be reproduced in accordance with your license without violation until the date of expiration as <br /> noted below . expiration as noted below . User Document: cra - jail -97bl41 .aia -- 10/29/2004. AIA License <br /> Number 1127252, which expires on 12/31/2004. <br /> 16 <br />