Laserfiche WebLink
• <br /> The Consultant will concentrate on the elimination of barriers that impede vital information flow <br /> between the components and establish a technological basis and managerial function that is <br /> aimed at reducing duplication and inefficiency in the system. Beyond identifying the opportunities <br /> for management improvements, the study team will recommend the management changes that <br /> will be necessary within each component. The Consultant will document the opportunities for a <br /> more efficient system through management and organizational changes and recommend specific <br /> roles and responsibilities in achieving the management changes. <br /> Each recommended improvement option will be factored into the overall growth management plan <br /> based on a prioritized level of need in conjunction with budget limitations.The impact of changing <br /> priorities will be examined so that a clear understanding emerges of how each planned strategy <br /> will affect the incarceration numbers or other aspects of the system as a whole. <br /> Subtask 5.3 Define the Objectives and Cost for Implementation <br /> Once the implementation plans are developed and approved by the PSCC, an overall estimation <br /> of costs inclusive of facility needs and program services together with a projected general budget <br /> target will be developed. A computerized "spread sheet"general budget guide who includes an <br /> annual inflation assumption will be prepared. General cost estimates and budget <br /> recommendations will be identified clearly by specific programmatic element and where applicable <br /> by institution or residential facility in order to be able to assign logical funding sources and to <br /> allocate cost responsibility between various agencies. Both short and long-term priorities and <br /> options will be clearly illustrated. <br /> All elements of the plan will be summarized in a recommended priority order with a suggested time <br /> schedule for implementation of each element. The approximate beginning and completion dates <br /> for each element will be given and summarized in a chart format as well so that each element can <br /> be visually considered in relation to all other elements. With consultation from County Board of <br /> Commissioners and PSCC members regarding the County's projected overall annual budget <br /> capacity from year to year,the study team will examine the recommended improvements budgets <br /> in relation to funding and finance capacity. Scheduling and priority assignments may then be <br /> adjusted as desired to match probable overall budget capacity limits. The schedule and priorities <br /> will be reviewed with the Committee to develop a consensus about the optimum preferred <br /> sequencing of all plan elements <br /> Review Workshop/Presentation <br /> Following the completion of the development options,another workshop meeting will be scheduled <br /> for the review of findings prior to finalization and submission. This meeting will discuss specific <br /> issues with individual groups. <br /> Subtask 5.4 Develop General Space Programs <br /> Using the results of the detailed personnel and space needs forecasts the study team will develop <br /> the next level of planning detail consisting of block space programs through the 2025 horizon. <br /> While these programs will not be detailed pre-design facility programs it is necessary to develop <br /> accurate estimates of spatial sizes, general adjacencies and general conditions needed to be able <br /> to determine realistic facility sizes and footprints for testing on site. The general programs will <br /> include space tables that will allow the development of facility concept drawings to be used to <br /> conduct thorough evaluations of all feasible combinations and options. <br />