Laserfiche WebLink
® Peter <br /> Ylil?At !i EROltill ?:V; IAP(';10#, \C <br /> Indian River County Jail Expansion 2005 <br /> Initial GMP Submittal <br /> Option 3 - Site Work , 256 - Bed Housing and Phase II Buildings <br /> January 30 , 2006 <br /> main for future buildings will not include DDCVA , only caps at the end of the <br /> piping . <br /> 02A- 10 . Storm water lines are included as indicated on civil drawings dated 12/20/05 . <br /> 02A- 11 . Site water line is included as an 8 - inch water main to make 90 degree turn and <br /> include 8 - inch BFP/RPZ and 4- inch meter. <br /> 02A- 12 . Site demolition is included as indicated on civil drawings dated 12/20/05 . <br /> 02A- 13 . The 6" PVC sanitary force main indicated on sheet C1 . 15 is not included ; this <br /> work is to be performed by public works under a separate contract . <br /> 02A- 14 . The service road ( under canopy) running from the existing area C east <br /> approximately 275 ' , north approximately 225 ' , east approximately 165 ' and <br /> south approximately 145 ' between the SE Dorm , SW Dorm and is included as <br /> concrete in lieu of asphalt paving as indicated on sheets A1 . 1 , A1 . 21 A1 . 3 and <br /> A1 . 4 . <br /> 02A- 15 . The service road running from the perimeter road , south between the Infirmary <br /> and NE Housing Dorm is excluded as Infirmary and NE Housing Dorm have <br /> been deleted from the Scope of Work in Option 3 . <br /> 02A- 16 . The section of the concrete walk north of the SE Housing Dorm to the perimeter <br /> road is not included . <br /> 02A- 17 . The section of the service road running between the south portion of the SE and <br /> SW Housing Dorms is included as asphalt as indicated on sheet C1 . 5 dated <br /> 12/20/05 in lieu of as indicated on sheets A1 . 11 A1 . 21 A1 . 3 and A1 . 4 ; and does <br /> not include metal canopy . <br /> 02B Fencing <br /> 0213 - 1 . A 3 ' - 0 " concrete apron is included around the perimeter of both perimeter <br /> security fences as indicated in R/A- 10 and S/A- 10 . <br /> 026 - 2 . Concrete grade beams indicated on Q/A- 10 are not included as all gates are in <br /> paved areas and will not require additional concrete . <br /> 0213 - 3 . The R outside perimeter fence is included as a 12 ' chainlink fence with razor <br /> wire per R/A- 10 dated 12/20/05in lieu of as indicated on sheet C1 . 5 dated <br /> 12/20/05 . <br /> 0213-4 . The S inside perimeter fence is included as an 8 ' chainlink fence with razor wire <br /> per S/A- 10 dated 12/20/05 in lieu of as indicated on sheet C1 . 5 dated 12/20/05 . <br /> Page 4 of 11 <br /> M : ACurrent Projects\Indian River Jail Expansion\Dormitory & Infirmary 112205 \Clarifications\Clarifications 122105 JS . doc <br />