Peter <br /> ® 00vn <br /> rrEIi Y� h'MM%N cPw�csn( nm. ',V <br /> Indian River County Jail Expansion 2005 <br /> Initial GMP Submittal <br /> Option 3 - Site Work , 256 - Bed Housing and Phase II Buildings <br /> January 30 , 2006 <br /> 18 . An allowance of $ 3 , 600 is included for inspections of all structural bolted and welded <br /> connections as listed in the Schedule of Allowances Section of this document . <br /> 19 . The cost for building layout is included as an allowance amount of $8 , 000 as listed in the <br /> Schedule of Allowances section of this document . <br /> 20 . Applications for Payment will be submitted in accordance with AIA A121 CMc 2003 <br /> between Indian River County Board of County Commissioners and Peter R . Brown <br /> Construction , Inc . in lieu of specification 01027 . <br /> Scope Clarifications <br /> 02A Site Work <br /> 02A- 1 . Site Dewatering is included as an allowance amount of $ 15 , 000 as listed in the <br /> Schedule of Allowances section of this document . <br /> 02A-2 . An allowance for rough grading is included in the amount of $ 35 , 000 as listed in <br /> the Schedule of Allowances section of this document . <br /> 02A- 3 . The cost for relocation of the site gas line servicing the kitchen is included in the <br /> kitchen renovation price not the site work price . <br /> 02A-4 . The site utilities (Water , Fire , Underground rain leader system ) for the <br /> warehouse and visitation are in the warehouse/visitation building price not the <br /> site work) . <br /> 02A- 5 . The civil plans dated 12/20/05 100 % CDs take precedence over the civil plans <br /> dated 10/21 /05 100 % CDs where indicated herein . However , grading allowance <br /> is included pending final approved design . <br /> 02A-6 . The areas where the Northeast Housing Dorm and Infirmary building were <br /> eliminated by Option 3 will be seeded . <br /> 02A- 7 . The asphalt drive on the 12/20/05 civil drawings sheet C1 . 5 that connects the <br /> Northeast Housing and Infirmary building to the perimeter road is eliminated per <br /> the selection of Option #3 . <br /> 02A- 8 . Directional boring at the Northeast area of the site is excluded ; work is to be <br /> performed by others per sheet C1 . 15 dated 12/20/05 . <br /> 02A- 9 . Site fire lines are included as an 8 - inch water main to make 90 degree turn and <br /> include 8- inch BFP/RPZ and 4 - inch meter. 8 - inch DDCVA and dedicated fire <br /> line to be deleted . Fire lines to be tapped at east side of site for each building <br /> and include a DDCVA at each tap location for a total of two (2 ) . Taps of fire <br /> Page 3 of 11 <br /> M :ACurrent Projects\Indian River Jail Expansion\Dormitory & Infirmary 112205\Clarifications\Clarifications 122105 JS . doc <br />