My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-038
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 3:34:05 PM
Creation date
9/30/2015 8:12:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/07/2006
Control Number
2006-038
Agenda Item Number
11.C.2.
Entity Name
Peter R. Brown Construction, Inc.
Subject
jail expansion project amendment one, reduces beds
Area
Indian River County jail
Supplemental fields
SmeadsoftID
4471
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peter <br /> ® 00vn <br /> rrEIi Y� h'MM%N cPw�csn( nm. ',V <br /> Indian River County Jail Expansion 2005 <br /> Initial GMP Submittal <br /> Option 3 - Site Work , 256 - Bed Housing and Phase II Buildings <br /> January 30 , 2006 <br /> 18 . An allowance of $ 3 , 600 is included for inspections of all structural bolted and welded <br /> connections as listed in the Schedule of Allowances Section of this document . <br /> 19 . The cost for building layout is included as an allowance amount of $8 , 000 as listed in the <br /> Schedule of Allowances section of this document . <br /> 20 . Applications for Payment will be submitted in accordance with AIA A121 CMc 2003 <br /> between Indian River County Board of County Commissioners and Peter R . Brown <br /> Construction , Inc . in lieu of specification 01027 . <br /> Scope Clarifications <br /> 02A Site Work <br /> 02A- 1 . Site Dewatering is included as an allowance amount of $ 15 , 000 as listed in the <br /> Schedule of Allowances section of this document . <br /> 02A-2 . An allowance for rough grading is included in the amount of $ 35 , 000 as listed in <br /> the Schedule of Allowances section of this document . <br /> 02A- 3 . The cost for relocation of the site gas line servicing the kitchen is included in the <br /> kitchen renovation price not the site work price . <br /> 02A-4 . The site utilities (Water , Fire , Underground rain leader system ) for the <br /> warehouse and visitation are in the warehouse/visitation building price not the <br /> site work) . <br /> 02A- 5 . The civil plans dated 12/20/05 100 % CDs take precedence over the civil plans <br /> dated 10/21 /05 100 % CDs where indicated herein . However , grading allowance <br /> is included pending final approved design . <br /> 02A-6 . The areas where the Northeast Housing Dorm and Infirmary building were <br /> eliminated by Option 3 will be seeded . <br /> 02A- 7 . The asphalt drive on the 12/20/05 civil drawings sheet C1 . 5 that connects the <br /> Northeast Housing and Infirmary building to the perimeter road is eliminated per <br /> the selection of Option #3 . <br /> 02A- 8 . Directional boring at the Northeast area of the site is excluded ; work is to be <br /> performed by others per sheet C1 . 15 dated 12/20/05 . <br /> 02A- 9 . Site fire lines are included as an 8 - inch water main to make 90 degree turn and <br /> include 8- inch BFP/RPZ and 4 - inch meter. 8 - inch DDCVA and dedicated fire <br /> line to be deleted . Fire lines to be tapped at east side of site for each building <br /> and include a DDCVA at each tap location for a total of two (2 ) . Taps of fire <br /> Page 3 of 11 <br /> M :ACurrent Projects\Indian River Jail Expansion\Dormitory & Infirmary 112205\Clarifications\Clarifications 122105 JS . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.