Laserfiche WebLink
Peter <br /> vraea a tieowa cnusiuncn¢a. o :c <br /> Indian River County Jail Expansion 2005 <br /> Initial GMP Submittal <br /> Option 3 - Site Work, 256 - Bed Housing and Phase II Buildings <br /> January 30 , 2006 <br /> 6 . The costs contained within the Proposal , unless specifically noted otherwise , are based <br /> upon manufacturer' s standard listings of colors , finishes , etc . <br /> 7 . It is assumed that retainage will not be held on CM bonds , insurances , quality control <br /> testing and General Condition items in accordance with Article 7 . 1 . 7 of the CM <br /> Agreement . CM General Condition items will be billed in equal amounts monthly from <br /> mobilization to substantial completion . <br /> 8 . If Indian River County elects to participate in the Sales Tax Savings Program , purchases <br /> available for purchase shall exceed $5 , 000 in value each , savings to accrue to Indian <br /> River County Contingency . The sales tax savings will be credited via deductive change <br /> order for all materials purchased . <br /> 9 . Proposal is valid for 10 days from the date of GMP Issuance ( January 30 , 2006 ) . This <br /> GMP assumes receipt of Notice to Proceed no later than February 9 , 2006 as listed in <br /> the Construction Schedule included in this document as Exhibit D . <br /> 10 . Electronic copies of record drawings are not included . Two sets of record drawings will <br /> be provided to Indian River County at completion of project indicating all modifications in <br /> colored ink . The additional cost for the electronic drawings is approximate $ 25 , 000 as <br /> listed in Alternate 12 . <br /> 11 . The costs for temporary power and water are included for the new 256 - bed Housing <br /> units only . <br /> 12 . A cost for six months of pest and rodent control is included for the new 256 - bed Housing <br /> units only . <br /> 13 . The cost for a temporary toilet facility is included to meet OSHA standards and <br /> regulations . <br /> 14 . Fire extinguishers , temporary barricades and job safety signs are included to meet <br /> OSHA standards and regulations . <br /> 15 . Final cleaning costs are not included in the base price of this project . Alternate # 10 <br /> includes the cost for this Scope of Work should Indian River County choose to include <br /> final cleaning . <br /> 16 . The demolition , abatement , removal or disposal of any contaminated , hazardous <br /> materials including but not limited to asbestos , toxic saturated materials , as well as any <br /> other unforeseen subsurface conditions such as sink holes , unsuitable soils and <br /> abandoned utilities are not included . Hazardous materials surveys or engineering are <br /> excluded as well . <br /> 17 . Costs for concrete and masonry quality control services are included . <br /> Page 2 of 11 <br /> MACurrent Projects4ndian River Jail Expansion\Dormitory & Infirmary 112205\Clarifications\Cl arifi cations 122105 JS . doc <br />