Laserfiche WebLink
Peter <br /> vr;i'aan e:anuv l:nasvtncnr .. nac <br /> Indian River County Jail Expansion 2005 <br /> Initial GMP Submittal <br /> Option 3 - Site Work , 256 - Bed Housing and Phase II Buildings <br /> January 30 , 2006 <br /> 06A-2 . Cabinets in rooms 144 , 145 and 146 on sheet A1 . 1 are assumed to match <br /> elevation 11 /A6 . 2 in lieu of elevation 10 as indicated on the floor plan . <br /> 06A- 3 . Counter shown in room 136 ( pantry) on sheet A1 . 1 is not included . <br /> 06A-4 . Cabinets in rooms 110 & 120 on sheet A1 . 2 are assumed to match elevation <br /> 9/A6 . 2 in lieu of elevation 14 as indicated on the floor plan . <br /> 06A-5 . The cabinets in the room H - 018 (TeleNisiting ) are excluded as requested by <br /> Indian River County ; however, the cabinets in the room H - 017 (check- in ) and H - <br /> 016 ( Office ) are included . <br /> 06A-6 . An elevation is not indicated on the floor plan for the cabinet in room G -035 <br /> ( Photo ID/ Finger Print) is assumed to match elevation 10/A6 . 1 . <br /> 07A Roofing & Siding <br /> 07A- 1 . The area above the clerestory windows is included as stucco inside and out as <br /> indicated in sheet A2 . 2 in lieu of detail B/A4 . 0 . <br /> 07B Detention Caulking, Building Insulation, Waterproofing and Dampproofing <br /> 0713 - 1 . Acoustical insulation is included above the GWB ceilings and all toilet rooms <br /> with ACT per spec section 07210 ( 2 . 03 ) B . <br /> 07B -2 . The water repellent sealer listed in spec section 07175 is indicated to be applied <br /> to all new brick veneer . This project will not contain brick veneer ; accordingly , <br /> the cost for the water repellent sealer is excluded . <br /> 0713 - 3 . The sheet membrane waterproofing material indicated in section 07115 of the <br /> Specifications Manual issued November 16 , 2005 is excluded . It is assumed that <br /> the sheet membrane waterproofing indicated in the specifications is to be used in <br /> a ceramic tile application and this project uses epoxy floors and it is not required . <br /> 07B -4 . The bituminous dampproofing listed in spec section 07160 is not indicated on the <br /> drawings ; therefore , the cost for bituminous dampproofing is not included . <br /> 0713 - 5 . Skylight indicated in sheet A9 . 3 detail F is not included . <br /> 08A Standard Glass / Glazing <br /> 08A- 1 . No clarifications at this time <br /> 09A Security Plaster <br /> 09A- 1 . Security plaster ceilings at Maintenance Building are not included as directed by <br /> Indian River County . Ceiling will be exposed with no paint finish . <br /> Page 7 of 11 <br /> M :ACurrent Projects\Indian River Jail Expansion\Dormitory & Infirmary 1 12205\Clarifications\Clarifications 122105 JS . doc <br />