Laserfiche WebLink
UPeter <br /> YIiCi:R2 BROWN OONS'IkOG(VOV, %( <br /> Indian River County Jail Expansion 2005 <br /> Initial GMP Submittal <br /> Option 3 - Site Work , 256 - Bed Housing and Phase II Buildings <br /> January 30 , 2006 <br /> 09B Drywall <br /> 0913 - 1 . Alternates 4 , 5 and 6 for drywall types are no longer valid as Option <br /> 3 has <br /> deleted the NE Housing Dorm and Infirmary . <br /> 09D Acoustical Ceilings <br /> 09D - 1 . Unistrut above acoustical ceiling tile is excluded , standard hanger wire is <br /> included . <br /> 09E Flooring <br /> 09E - 1 . No clarifications at this time <br /> 09F Painting <br /> 09F- 1 . Exterior painting is limited to new construction and areas where renovation <br /> occurs . All other areas are excluded . <br /> 09F -2 . All block noted as fluted block is included as standard face block with a smooth <br /> paint finish . <br /> 09G Epoxy Flooring <br /> 09G - 1 . An allowance to include vapor barriers at approximately 1 , 200 SQFT of floor area <br /> is included . <br /> 10A Toilet, Bath and Miscellaneous Accessories <br /> 10A- 1 . Tack boards are not included ; Alternate 14 details the cost for the tack boards in <br /> the event that Indian River County chooses to contract this item at a later time . <br /> 10A-2 . The costs for lockers are not included ; Alternate 14 details the additional cost for <br /> lockers in the event that Indian River County chooses to contract this item at a <br /> later time . <br /> 10B Walkway Covers <br /> 1013 - 1 . It is assumed that the walkway covers east of the new buildings gabled roofs and <br /> the walkway covers west of the new buildings are single slope . <br /> 1013-2 . The 13 ' - 0 " wide aluminum walkway is limited to 9 , 554sf. This will cover the <br /> sidewalk that begins at the south building queuing area and wraps around the <br /> northwest portion of the Southwest Housing Dorm building and ties in to the <br /> existing building . All other sidewalks and walkways at the new Housing facilities <br /> are eliminated from the scope of work . <br /> 11A Detention Equipment <br /> 11A- 1 . Opening A- 156 is not listed on the door schedule , it is assumed that is opening is <br /> existing and will remain as- is . <br /> 11A-2 . Benches in the Intake building holding areas are included as bolt-down stainless <br /> steel benches in lieu of concrete . <br /> Page 8 of 11 <br /> MACurrent Projects\Indian River Jail Expansion\Dormitory & Infirmary 112205\Clarifications\Clarifications 122105 JS . doc <br />